变革管理带来AMI清洁能源效益

Eric Chung, Ariel Killen-Sweeney, John Lang
{"title":"变革管理带来AMI清洁能源效益","authors":"Eric Chung,&nbsp;Ariel Killen-Sweeney,&nbsp;John Lang","doi":"10.1002/gas.22357","DOIUrl":null,"url":null,"abstract":"<p>Solving the global climate dilemma requires significant changes in today's electric grid to become the clean energy grid of the future. Utilities are making substantial grid modernization investments on behalf of customers to support additional load expectations for electrification, the connection of Distributed Energy Resources (DERs), the implementation of Time-of-Use (TOU) rates, and other significant programs. One of the foundational investments utilities must make to enable these programs and realize their benefits is Advanced Metering Infrastructure (AMI).</p>","PeriodicalId":100259,"journal":{"name":"Climate and Energy","volume":"40 1","pages":"1-9"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Change Management Delivering AMI Clean Energy Benefits\",\"authors\":\"Eric Chung,&nbsp;Ariel Killen-Sweeney,&nbsp;John Lang\",\"doi\":\"10.1002/gas.22357\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Solving the global climate dilemma requires significant changes in today's electric grid to become the clean energy grid of the future. Utilities are making substantial grid modernization investments on behalf of customers to support additional load expectations for electrification, the connection of Distributed Energy Resources (DERs), the implementation of Time-of-Use (TOU) rates, and other significant programs. One of the foundational investments utilities must make to enable these programs and realize their benefits is Advanced Metering Infrastructure (AMI).</p>\",\"PeriodicalId\":100259,\"journal\":{\"name\":\"Climate and Energy\",\"volume\":\"40 1\",\"pages\":\"1-9\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Climate and Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1002/gas.22357\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Climate and Energy","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/gas.22357","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

解决全球气候困境需要对当今电网进行重大变革,使其成为未来的清洁能源电网。公用事业公司正在代表客户进行大量的电网现代化投资,以支持电气化、分布式能源(DER)连接、使用时间(TOU)费率的实施以及其他重要项目的额外负荷预期。公用事业公司必须进行的基础投资之一是先进计量基础设施(AMI),以实现这些项目并实现其效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Change Management Delivering AMI Clean Energy Benefits

Solving the global climate dilemma requires significant changes in today's electric grid to become the clean energy grid of the future. Utilities are making substantial grid modernization investments on behalf of customers to support additional load expectations for electrification, the connection of Distributed Energy Resources (DERs), the implementation of Time-of-Use (TOU) rates, and other significant programs. One of the foundational investments utilities must make to enable these programs and realize their benefits is Advanced Metering Infrastructure (AMI).

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Community-Centered Grid Infrastructure Development The Value of International Engagement in Energy Education Assuring Energy Infrastructure Reliability and Resiliency Advanced Metering Infrastructure: Continued Evolution and Opportunities to Deliver Greater Value Can Fund for Responding to Loss and Damage Survive the Voluntary Financing Structure?
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1