{"title":"供应不确定性下分散装配系统的零部件采购策略","authors":"Wenting Pan, K. C. So","doi":"10.1080/0740817X.2015.1063793","DOIUrl":null,"url":null,"abstract":"Abstract In this article we analyze the interactions among the assembler and two component suppliers in their procurement decisions under a Vendor-Managed Inventory (VMI) contract. Under the VMI contract, the assembler first offers a unit price for each component and will pay component suppliers only for the amounts used to meet the actual demand. The two independent component suppliers then decide on the production quantities of their individual components before the actual demand is realized. We assume that one of the component suppliers has uncertainty in the supply process, in which the actual number of components available for assembly is equal to a random fraction of the production quantity. Under the assembly structure, both component suppliers need to take into account the underlying supply uncertainty in deciding their individual production quantities, as both components are required for the assembly of the final product. We first analyze the special case under deterministic demand and then extend our analysis to the general case under stochastic demand. We derive the optimal component prices offered by the assembler and the corresponding equilibrium production quantities of the component suppliers.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"42 1","pages":"267 - 282"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0740817X.2015.1063793","citationCount":"24","resultStr":"{\"title\":\"Component procurement strategies in decentralized assembly systems under supply uncertainty\",\"authors\":\"Wenting Pan, K. C. So\",\"doi\":\"10.1080/0740817X.2015.1063793\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract In this article we analyze the interactions among the assembler and two component suppliers in their procurement decisions under a Vendor-Managed Inventory (VMI) contract. Under the VMI contract, the assembler first offers a unit price for each component and will pay component suppliers only for the amounts used to meet the actual demand. The two independent component suppliers then decide on the production quantities of their individual components before the actual demand is realized. We assume that one of the component suppliers has uncertainty in the supply process, in which the actual number of components available for assembly is equal to a random fraction of the production quantity. Under the assembly structure, both component suppliers need to take into account the underlying supply uncertainty in deciding their individual production quantities, as both components are required for the assembly of the final product. We first analyze the special case under deterministic demand and then extend our analysis to the general case under stochastic demand. We derive the optimal component prices offered by the assembler and the corresponding equilibrium production quantities of the component suppliers.\",\"PeriodicalId\":13379,\"journal\":{\"name\":\"IIE Transactions\",\"volume\":\"42 1\",\"pages\":\"267 - 282\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0740817X.2015.1063793\",\"citationCount\":\"24\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IIE Transactions\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/0740817X.2015.1063793\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0740817X.2015.1063793","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24

摘要

摘要本文分析了供应商管理库存(VMI)合同下装配商和两个零部件供应商在采购决策中的相互作用。根据VMI合同,组装商首先为每个组件提供一个单价,然后只向组件供应商支付满足实际需求的数量。然后,两个独立的组件供应商在实际需求实现之前决定各自组件的生产数量。我们假设其中一个零件供应商在供应过程中存在不确定性,其中可供装配的零件的实际数量等于生产数量的一个随机分数。在装配结构下,两个零部件供应商在决定各自的生产数量时都需要考虑潜在的供应不确定性,因为这两个零部件都是组装最终产品所必需的。首先分析了确定性需求下的特殊情况,然后将分析推广到随机需求下的一般情况。我们推导出装配商提供的最优零部件价格和零部件供应商相应的均衡产量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Component procurement strategies in decentralized assembly systems under supply uncertainty
Abstract In this article we analyze the interactions among the assembler and two component suppliers in their procurement decisions under a Vendor-Managed Inventory (VMI) contract. Under the VMI contract, the assembler first offers a unit price for each component and will pay component suppliers only for the amounts used to meet the actual demand. The two independent component suppliers then decide on the production quantities of their individual components before the actual demand is realized. We assume that one of the component suppliers has uncertainty in the supply process, in which the actual number of components available for assembly is equal to a random fraction of the production quantity. Under the assembly structure, both component suppliers need to take into account the underlying supply uncertainty in deciding their individual production quantities, as both components are required for the assembly of the final product. We first analyze the special case under deterministic demand and then extend our analysis to the general case under stochastic demand. We derive the optimal component prices offered by the assembler and the corresponding equilibrium production quantities of the component suppliers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
期刊最新文献
EOV Focus Area Editorial Boards Strategic health workforce planning Efficient computation of the likelihood expansions for diffusion models An introduction to optimal power flow: Theory, formulation, and examples An integrated failure mode and effect analysis approach for accurate risk assessment under uncertainty
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1