{"title":"不同竞价块数对发电公司竞价策略的影响","authors":"Lu Wang, F. Wen, C. Yu","doi":"10.13335/J.1000-3673.PST.2006.19.006","DOIUrl":null,"url":null,"abstract":"In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.","PeriodicalId":20420,"journal":{"name":"电网技术","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2006-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impacts of different numbers of bidding blocks on generation companies’ bidding strategies\",\"authors\":\"Lu Wang, F. Wen, C. Yu\",\"doi\":\"10.13335/J.1000-3673.PST.2006.19.006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.\",\"PeriodicalId\":20420,\"journal\":{\"name\":\"电网技术\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"电网技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.13335/J.1000-3673.PST.2006.19.006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"电网技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.13335/J.1000-3673.PST.2006.19.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
Impacts of different numbers of bidding blocks on generation companies’ bidding strategies
In view of stepwise bidding protocol that is commonly adopted in practical operated electricity market home and abroad,the impacts of different numbers of bidding blocks on the bidding strategies of generation companies are investigated.As a preliminary research,here,the generation companies,which act as price-taker,are taken as subject investigated.Firstly,the electricity price in the market is simulated by probabilistic methods,on this basis and by use of average probability of wins a multi-block bidding model that simulate optimal bidding strategy of generation company is built.Then,the impacts of both generation company's risk preference extent and market information asymmetry on the construction of generation company's optimal bidding strategy are researched.Finally,a numerical example is used to demonstrate the proposed model and method,with special emphasis on the impacts of different numbers of bidding blocks on the optimal bidding strategy of generation companies.
期刊介绍:
"Power System Technology" (monthly) was founded in 1957. It is a comprehensive academic journal in the field of energy and power, supervised and sponsored by the State Grid Corporation of China. It is published by the Power System Technology Magazine Co., Ltd. of the China Electric Power Research Institute. It is publicly distributed at home and abroad and is included in 12 famous domestic and foreign literature databases such as the Engineering Index (EI) and the National Chinese Core Journals.
The purpose of "Power System Technology" is to serve the national innovation-driven development strategy, promote scientific and technological progress in my country's energy and power fields, and promote the application of new technologies and new products. "Power System Technology" has adhered to the publishing characteristics of combining "theoretical innovation with applied practice" for many years, and the scope of manuscript selection covers the fields of power generation, transmission, distribution, and electricity consumption.