伊朗建筑行业的供应链合作

Zahra Toroghi Bidabadi, M. Hosseinalipour, M. Hamidizadeh, Amirhossein Mohebifar
{"title":"伊朗建筑行业的供应链合作","authors":"Zahra Toroghi Bidabadi, M. Hosseinalipour, M. Hamidizadeh, Amirhossein Mohebifar","doi":"10.1515/otmcj-2016-0004","DOIUrl":null,"url":null,"abstract":"Abstract Collaboration is an important factor to succeed and increase the sustainability in project management and construction, especially in a construction supply chain (CSC) that includes multiple partners. Although, in recent decades, many changes have occurred in the construction industry, there are still many problems in this area. Therefore, research in this area becomes vital because collaboration is one of the best approaches to improve CSC performance. In this study, collaborative relationship has been found to be affected by three main factors: managerial, financial and structural. However, application of collaboration in Iran is still in its inception. This comprehensive research study focuses on suitable context for implementing the collaboration method. The methodology of this research is based on interviews and a review of previous research, which identifies critical factors and positive results of use in relation to collaboration. Results of this study improve our knowledge about the role of collaboration in a CSC's performance. Analysis of data shows that managerial factors have the most positive effects on the implementation of collaboration networks in CSCs, followed by financial factors and organizational factors.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"8 1","pages":"1437 - 1445"},"PeriodicalIF":1.6000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Supply chain collaboration within the Iranian construction industry\",\"authors\":\"Zahra Toroghi Bidabadi, M. Hosseinalipour, M. Hamidizadeh, Amirhossein Mohebifar\",\"doi\":\"10.1515/otmcj-2016-0004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Collaboration is an important factor to succeed and increase the sustainability in project management and construction, especially in a construction supply chain (CSC) that includes multiple partners. Although, in recent decades, many changes have occurred in the construction industry, there are still many problems in this area. Therefore, research in this area becomes vital because collaboration is one of the best approaches to improve CSC performance. In this study, collaborative relationship has been found to be affected by three main factors: managerial, financial and structural. However, application of collaboration in Iran is still in its inception. This comprehensive research study focuses on suitable context for implementing the collaboration method. The methodology of this research is based on interviews and a review of previous research, which identifies critical factors and positive results of use in relation to collaboration. Results of this study improve our knowledge about the role of collaboration in a CSC's performance. Analysis of data shows that managerial factors have the most positive effects on the implementation of collaboration networks in CSCs, followed by financial factors and organizational factors.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"8 1\",\"pages\":\"1437 - 1445\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/otmcj-2016-0004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/otmcj-2016-0004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 6

摘要

摘要协作是项目管理和建设中取得成功和提高可持续性的重要因素,特别是在包含多个合作伙伴的建筑供应链中。尽管近几十年来,建筑业发生了许多变化,但这一领域仍然存在许多问题。因此,该领域的研究变得至关重要,因为协作是提高CSC性能的最佳方法之一。本研究发现,协同关系受管理、财务和结构三个主要因素的影响。然而,合作在伊朗的应用仍处于起步阶段。这项综合研究的重点是实施协作方法的合适背景。本研究的方法基于访谈和对先前研究的回顾,该研究确定了与协作相关的关键因素和使用的积极结果。本研究的结果提高了我们对协作在CSC绩效中的作用的认识。数据分析表明,管理因素对企业协作网络实施的积极影响最大,其次是财务因素和组织因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Supply chain collaboration within the Iranian construction industry
Abstract Collaboration is an important factor to succeed and increase the sustainability in project management and construction, especially in a construction supply chain (CSC) that includes multiple partners. Although, in recent decades, many changes have occurred in the construction industry, there are still many problems in this area. Therefore, research in this area becomes vital because collaboration is one of the best approaches to improve CSC performance. In this study, collaborative relationship has been found to be affected by three main factors: managerial, financial and structural. However, application of collaboration in Iran is still in its inception. This comprehensive research study focuses on suitable context for implementing the collaboration method. The methodology of this research is based on interviews and a review of previous research, which identifies critical factors and positive results of use in relation to collaboration. Results of this study improve our knowledge about the role of collaboration in a CSC's performance. Analysis of data shows that managerial factors have the most positive effects on the implementation of collaboration networks in CSCs, followed by financial factors and organizational factors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1