新加坡樟宜填海工程的仪器

IF 0.3 Q4 ENGINEERING, GEOLOGICAL Geotechnical Engineering Pub Date : 2009-02-01 DOI:10.1680/GENG.2009.162.1.33
A. Arulrajah, M. W. Bo, J. Chu, H. Nikraz
{"title":"新加坡樟宜填海工程的仪器","authors":"A. Arulrajah, M. W. Bo, J. Chu, H. Nikraz","doi":"10.1680/GENG.2009.162.1.33","DOIUrl":null,"url":null,"abstract":"Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpi...","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"24 1","pages":"33-40"},"PeriodicalIF":0.3000,"publicationDate":"2009-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2009.162.1.33","citationCount":"33","resultStr":"{\"title\":\"Instrumentation at Changi land reclamation project, Singapore\",\"authors\":\"A. Arulrajah, M. W. Bo, J. Chu, H. Nikraz\",\"doi\":\"10.1680/GENG.2009.162.1.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpi...\",\"PeriodicalId\":45150,\"journal\":{\"name\":\"Geotechnical Engineering\",\"volume\":\"24 1\",\"pages\":\"33-40\"},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2009-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1680/GENG.2009.162.1.33\",\"citationCount\":\"33\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geotechnical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/GENG.2009.162.1.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/GENG.2009.162.1.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 33

摘要

在软土堆积层的土地复垦工程中,为了减少未来静、活荷载作用下的沉降,往往需要对地基进行改良。在海相粘土沉积较厚的情况下,通常需要使用预制垂直排水沟来加速粘土的固结过程。在此类工程中,必须确定改善程度,以确定土壤是否达到所需的固结程度,然后再去除附加物。这种分析可以通过从仪器安装之日起连续监测地面行为的观测方法来进行。本文以新加坡樟宜东填海工程为例,介绍了岩土工程仪器在施工控制中的应用。本工程采用的现场仪器有沉降板、深度沉降计、土压力计、气动压力表、电压力表、水柱等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Instrumentation at Changi land reclamation project, Singapore
Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpi...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Geotechnical Engineering
Geotechnical Engineering ENGINEERING, GEOLOGICAL-
CiteScore
0.50
自引率
0.00%
发文量
0
期刊介绍: The objectives of the Association shall be the promotion of co-operation among geotechnical societies in SE Asia; and the assistance to member societies who have limited number of members. Now there is only one combined web titled: AGSSEA-SEAGS. SEAGS & AGSSEA encourage the submission of scholarly and practice-oriented articles to its journal. The journal is published quarterly. Both sponsors of the journal, the Southeast Asian Geotechnical Society and the Association of Geotechnical Societies in Southeast Asia, promote the ideals and goals of the International Society of Soil Mechanics and Geotechhnical Engineering in fostering communications, developing insights and enabling the advancement of the geotechnical engineering discipline.
期刊最新文献
Influence of testing on permeability of compacted fine soils Recently in Géotechnique Instrumentation at Changi land reclamation project, Singapore On-site characterisation of loessic deposits in Kent, UK Deflectometer-based analysis of ballasted railway tracks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1