用风险管理工具支持决策

IF 0.4 Q4 BUSINESS, FINANCE Public Finance Quarterly-Hungary Pub Date : 2022-01-01 DOI:10.35551/pfq_2022_s_1_2
I. Fekete
{"title":"用风险管理工具支持决策","authors":"I. Fekete","doi":"10.35551/pfq_2022_s_1_2","DOIUrl":null,"url":null,"abstract":"This year the Directives (hereinafter referred to as: Directives) to implement Act CXXII of 2009 and Government Decree 339/2019 on the internal control system of companies in public ownership were issued. One focal element of the internal control system is illuminated in the first part of the study in detail, based on the theoretical background of establishing the risk management system and the relevant standards and academic literature. It turns out from the first part that the key added value of risk management is the support given to decisions made at different levels. The study therefore presents a potential approach to demonstrate how risk management may be used efficiently to support strategic and project level decision-making, if there are no past data available, or not in sufficient quantity. In the second part of the study the author shows the experiences of the implementation of the risk management system - pursuant to the Directives - via the example of a large company. Relying partly on this and using his own experiences of many years the author specifies the factors supporting and hindering the implementation of the risk management system. According to his intention, the author specifies messages that may be helpful to practising experts to avoid the detection, evaluation and management of risks becoming administrative tasks. They must instead contribute to the longterm successful operation of the using organisation.","PeriodicalId":42979,"journal":{"name":"Public Finance Quarterly-Hungary","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Supporting Decision-Making with the Tools of Risk Management\",\"authors\":\"I. Fekete\",\"doi\":\"10.35551/pfq_2022_s_1_2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This year the Directives (hereinafter referred to as: Directives) to implement Act CXXII of 2009 and Government Decree 339/2019 on the internal control system of companies in public ownership were issued. One focal element of the internal control system is illuminated in the first part of the study in detail, based on the theoretical background of establishing the risk management system and the relevant standards and academic literature. It turns out from the first part that the key added value of risk management is the support given to decisions made at different levels. The study therefore presents a potential approach to demonstrate how risk management may be used efficiently to support strategic and project level decision-making, if there are no past data available, or not in sufficient quantity. In the second part of the study the author shows the experiences of the implementation of the risk management system - pursuant to the Directives - via the example of a large company. Relying partly on this and using his own experiences of many years the author specifies the factors supporting and hindering the implementation of the risk management system. According to his intention, the author specifies messages that may be helpful to practising experts to avoid the detection, evaluation and management of risks becoming administrative tasks. They must instead contribute to the longterm successful operation of the using organisation.\",\"PeriodicalId\":42979,\"journal\":{\"name\":\"Public Finance Quarterly-Hungary\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Public Finance Quarterly-Hungary\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35551/pfq_2022_s_1_2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Public Finance Quarterly-Hungary","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35551/pfq_2022_s_1_2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

摘要

今年颁布了实施2009年第CXXII号法案和关于公有制公司内部控制制度的第339/2019号政府法令的指令(以下简称:指令)。第一部分根据风险管理体系建立的理论背景,结合相关规范和学术文献,对内部控制制度的一个重点要素进行了详细阐述。从第一部分可以看出,风险管理的关键附加值在于对不同层次决策的支持。因此,该研究提出了一种潜在的方法来演示如何有效地使用风险管理来支持战略和项目级别的决策,如果没有过去可用的数据,或者没有足够的数量。在研究的第二部分,作者通过一个大公司的例子,展示了根据指令实施风险管理系统的经验。在此基础上,作者结合自己多年的实践经验,明确了支持和阻碍风险管理体系实施的因素。根据他的意图,作者指定了可能有助于执业专家的信息,以避免风险的检测、评估和管理成为行政任务。相反,他们必须为使用组织的长期成功运作做出贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Supporting Decision-Making with the Tools of Risk Management
This year the Directives (hereinafter referred to as: Directives) to implement Act CXXII of 2009 and Government Decree 339/2019 on the internal control system of companies in public ownership were issued. One focal element of the internal control system is illuminated in the first part of the study in detail, based on the theoretical background of establishing the risk management system and the relevant standards and academic literature. It turns out from the first part that the key added value of risk management is the support given to decisions made at different levels. The study therefore presents a potential approach to demonstrate how risk management may be used efficiently to support strategic and project level decision-making, if there are no past data available, or not in sufficient quantity. In the second part of the study the author shows the experiences of the implementation of the risk management system - pursuant to the Directives - via the example of a large company. Relying partly on this and using his own experiences of many years the author specifies the factors supporting and hindering the implementation of the risk management system. According to his intention, the author specifies messages that may be helpful to practising experts to avoid the detection, evaluation and management of risks becoming administrative tasks. They must instead contribute to the longterm successful operation of the using organisation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.90
自引率
40.00%
发文量
30
期刊最新文献
A stagflation-proof bill of exchange circulation model – Presentation and evaluation Integration of financial institutions supported with data asset development – Magyar Bankholding case study Rule-based budgeting and the financial stability – the European solution Handling outliers in bankruptcy prediction models based on logistic regression Euro area economic growth between 2010 and 2019 in the light of secular stagnation theory
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1