{"title":"海上浮式风力发电项目综述","authors":"A. Maimon","doi":"10.35219/ANNUGALSHIPBUILDING.2018.41.08","DOIUrl":null,"url":null,"abstract":"The main purpose of this article is to point out the actual progress on offshore wind turbine projects by stressing their differences of construction in all their main parts: turbines, floats, mooring and foundations systems and the installation characteristics. Floating offshore wind turbines offer great savings in terms of installation: the float-turbine assembly can be done in basin or dock, regardless of weather conditions, the towing to the site is done by simple offshore tugs, the anchorage of the wind turbine requires the help of anchor hoisting vessels, very common in the offshore oil and the anchorage is done quickly by comparison to the installation of a conventional offshore wind turbine that requires many specialized vessels, type heavy haulage carrier for foundations and jack-up vessels for the installation of the turbine.","PeriodicalId":33188,"journal":{"name":"Annals of Dunarea de Jos University of Galati Fascicle XI Shipbuilding","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Brief review about floating offshore wind turbines projects\",\"authors\":\"A. Maimon\",\"doi\":\"10.35219/ANNUGALSHIPBUILDING.2018.41.08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main purpose of this article is to point out the actual progress on offshore wind turbine projects by stressing their differences of construction in all their main parts: turbines, floats, mooring and foundations systems and the installation characteristics. Floating offshore wind turbines offer great savings in terms of installation: the float-turbine assembly can be done in basin or dock, regardless of weather conditions, the towing to the site is done by simple offshore tugs, the anchorage of the wind turbine requires the help of anchor hoisting vessels, very common in the offshore oil and the anchorage is done quickly by comparison to the installation of a conventional offshore wind turbine that requires many specialized vessels, type heavy haulage carrier for foundations and jack-up vessels for the installation of the turbine.\",\"PeriodicalId\":33188,\"journal\":{\"name\":\"Annals of Dunarea de Jos University of Galati Fascicle XI Shipbuilding\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annals of Dunarea de Jos University of Galati Fascicle XI Shipbuilding\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35219/ANNUGALSHIPBUILDING.2018.41.08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of Dunarea de Jos University of Galati Fascicle XI Shipbuilding","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35219/ANNUGALSHIPBUILDING.2018.41.08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的主要目的是指出海上风电项目的实际进展,强调它们在所有主要部件:涡轮机、浮子、系泊和基础系统以及安装特点上的施工差异。漂浮式海上风力涡轮机在安装方面节省了大量费用:浮式涡轮机组装可以在盆地或码头完成,无论天气状况如何,拖到现场是由简单的海上拖船完成的,风力涡轮机的锚固需要锚吊装船的帮助,这在海上石油中很常见,与安装需要许多专业船只的传统海上风力涡轮机相比,锚固可以快速完成。重型运输船用于基础和自升式船舶,用于安装涡轮机。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Brief review about floating offshore wind turbines projects
The main purpose of this article is to point out the actual progress on offshore wind turbine projects by stressing their differences of construction in all their main parts: turbines, floats, mooring and foundations systems and the installation characteristics. Floating offshore wind turbines offer great savings in terms of installation: the float-turbine assembly can be done in basin or dock, regardless of weather conditions, the towing to the site is done by simple offshore tugs, the anchorage of the wind turbine requires the help of anchor hoisting vessels, very common in the offshore oil and the anchorage is done quickly by comparison to the installation of a conventional offshore wind turbine that requires many specialized vessels, type heavy haulage carrier for foundations and jack-up vessels for the installation of the turbine.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
A comparative evaluation of the behaviour of some typical floating offshore structures Aspects of using 3-D laser scanning technology in ship retrofit projects The influence of distance between the floats of catamaran hull On 3D-FEM analysis of a 9000 tdw tanker global eigen vibration modes Seaway and Octopus as a study tools for ship motions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1