{"title":"基于多二次径向基函数(RBFMQ)的柳树溢流河床响应","authors":"Lenka Balážovičová","doi":"10.33542/gc2021-2-01","DOIUrl":null,"url":null,"abstract":"To establish the success of any river engineering revetment, post-project monitoring is a critical part of the process. Vegetation structures often lack detailed biological or geomorphological data to aid management procedures and project planning. Apart from the survival and growth rates, data mapping detailed changes on the riverbed and its response to bankfull events are critical. Riverbed adjacent to two willow spilling structures on the River Stour in East Anglia, UK, was surveyed before and after high flow events. The random field data were gridded using Radial Basis Function with Multiquadric option (RBF MQ) to reconstruct the surface most accurately, as it was found to be the most effective out of three methods tested. Data were gridded, sliced and cross-sections were plotted and compared at each site before and soon after high flow events. Image maps were generated, and volumetric changes were calculated. At both sites, erosion dominated in the upstream and sedimentation in the downstream sections of the bed surveyed. Structure undercutting occurred at gravel site up to 29 cm which is a rate that needs a management intervention to prevent project failure.","PeriodicalId":42446,"journal":{"name":"Geographia Cassoviensis","volume":"1 1","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Riverbed response to high flows with installed willow spiling using Multiquadric Radial Basis Function (RBFMQ)\",\"authors\":\"Lenka Balážovičová\",\"doi\":\"10.33542/gc2021-2-01\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To establish the success of any river engineering revetment, post-project monitoring is a critical part of the process. Vegetation structures often lack detailed biological or geomorphological data to aid management procedures and project planning. Apart from the survival and growth rates, data mapping detailed changes on the riverbed and its response to bankfull events are critical. Riverbed adjacent to two willow spilling structures on the River Stour in East Anglia, UK, was surveyed before and after high flow events. The random field data were gridded using Radial Basis Function with Multiquadric option (RBF MQ) to reconstruct the surface most accurately, as it was found to be the most effective out of three methods tested. Data were gridded, sliced and cross-sections were plotted and compared at each site before and soon after high flow events. Image maps were generated, and volumetric changes were calculated. At both sites, erosion dominated in the upstream and sedimentation in the downstream sections of the bed surveyed. Structure undercutting occurred at gravel site up to 29 cm which is a rate that needs a management intervention to prevent project failure.\",\"PeriodicalId\":42446,\"journal\":{\"name\":\"Geographia Cassoviensis\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geographia Cassoviensis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33542/gc2021-2-01\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"GEOGRAPHY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geographia Cassoviensis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33542/gc2021-2-01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOGRAPHY","Score":null,"Total":0}
Riverbed response to high flows with installed willow spiling using Multiquadric Radial Basis Function (RBFMQ)
To establish the success of any river engineering revetment, post-project monitoring is a critical part of the process. Vegetation structures often lack detailed biological or geomorphological data to aid management procedures and project planning. Apart from the survival and growth rates, data mapping detailed changes on the riverbed and its response to bankfull events are critical. Riverbed adjacent to two willow spilling structures on the River Stour in East Anglia, UK, was surveyed before and after high flow events. The random field data were gridded using Radial Basis Function with Multiquadric option (RBF MQ) to reconstruct the surface most accurately, as it was found to be the most effective out of three methods tested. Data were gridded, sliced and cross-sections were plotted and compared at each site before and soon after high flow events. Image maps were generated, and volumetric changes were calculated. At both sites, erosion dominated in the upstream and sedimentation in the downstream sections of the bed surveyed. Structure undercutting occurred at gravel site up to 29 cm which is a rate that needs a management intervention to prevent project failure.
期刊介绍:
Geographia Cassoviensis is a biannual peer-reviewed journal published by the Pavol Jozef Šafárik University in Košice since 2007. It is available both in print and open-access electronic version. The journal publishes original research articles from Geography and other closely-related research fields. Since 2016 the journal is indexed in SCOPUS and ERIH PLUS - European Reference Index for Humanities and Social Sciences, and since 2017 also in Emerging Sources Citation Index by Clarivate Analytics.