{"title":"2020年2月至2021年5月因加水电站群松戈盆地引水运河沉积演化研究(刚果中部省/刚果民主共和国)","authors":"O. K. Kalonda, Ivon Ndala Tshiwis, Boniface Mumbimb Atalatala, Clement N'zau Umba-di-Mbudi","doi":"10.4236/gep.2023.115024","DOIUrl":null,"url":null,"abstract":"The headrace of the Inga hydropower complex is experiencing siltation problems, reducing the exploitable draft and limiting the production capacity of the two main Inga hydropower plants during the low water period. During the 2019 low water period, several sediment slumps occurred in the Shongo basin, disrupting the production of hydroelectric power generated by the Inga 1 & 2 power plant, resulting in massive load shedding of power supply to downstream customers. The cardinal aim of this study is to determine the quantities of sediments deposited and those eroded, in order to know the evolution of sedimentation in the Shongo basin from February 2020 to May 2021. The results obtained show that the running index of the generating units is determinant and influences the sedimentation process in the Shongo basin. The cleaning of the Shongo basin in terms of the spatial distribution of sedimentation from February 2020 to May 2021 is plausible.","PeriodicalId":58477,"journal":{"name":"地球科学和环境保护期刊(英文)","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evolution of Sedimentation in a Headrace Canal for Hydroelectric Production Case of the Shongo Basin of the Inga Complex from February 2020 to May 2021 (Kongo Central Province/DR Congo)\",\"authors\":\"O. K. Kalonda, Ivon Ndala Tshiwis, Boniface Mumbimb Atalatala, Clement N'zau Umba-di-Mbudi\",\"doi\":\"10.4236/gep.2023.115024\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The headrace of the Inga hydropower complex is experiencing siltation problems, reducing the exploitable draft and limiting the production capacity of the two main Inga hydropower plants during the low water period. During the 2019 low water period, several sediment slumps occurred in the Shongo basin, disrupting the production of hydroelectric power generated by the Inga 1 & 2 power plant, resulting in massive load shedding of power supply to downstream customers. The cardinal aim of this study is to determine the quantities of sediments deposited and those eroded, in order to know the evolution of sedimentation in the Shongo basin from February 2020 to May 2021. The results obtained show that the running index of the generating units is determinant and influences the sedimentation process in the Shongo basin. The cleaning of the Shongo basin in terms of the spatial distribution of sedimentation from February 2020 to May 2021 is plausible.\",\"PeriodicalId\":58477,\"journal\":{\"name\":\"地球科学和环境保护期刊(英文)\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"地球科学和环境保护期刊(英文)\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.4236/gep.2023.115024\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"地球科学和环境保护期刊(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.4236/gep.2023.115024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Evolution of Sedimentation in a Headrace Canal for Hydroelectric Production Case of the Shongo Basin of the Inga Complex from February 2020 to May 2021 (Kongo Central Province/DR Congo)
The headrace of the Inga hydropower complex is experiencing siltation problems, reducing the exploitable draft and limiting the production capacity of the two main Inga hydropower plants during the low water period. During the 2019 low water period, several sediment slumps occurred in the Shongo basin, disrupting the production of hydroelectric power generated by the Inga 1 & 2 power plant, resulting in massive load shedding of power supply to downstream customers. The cardinal aim of this study is to determine the quantities of sediments deposited and those eroded, in order to know the evolution of sedimentation in the Shongo basin from February 2020 to May 2021. The results obtained show that the running index of the generating units is determinant and influences the sedimentation process in the Shongo basin. The cleaning of the Shongo basin in terms of the spatial distribution of sedimentation from February 2020 to May 2021 is plausible.