时间成本权衡问题及其扩展:现状调查与展望

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2023-01-01 DOI:10.5267/j.jpm.2023.4.001
Maedeh Hosseinpour, E. Roghanian, G. Weber
{"title":"时间成本权衡问题及其扩展:现状调查与展望","authors":"Maedeh Hosseinpour, E. Roghanian, G. Weber","doi":"10.5267/j.jpm.2023.4.001","DOIUrl":null,"url":null,"abstract":"The time-cost optimization is amongst the most critical fields, which has an extensive range of implementation in project scheduling. Achieving a satisfactory balance between these factors can lead to an efficient construction project by reducing both the length of the project and costs at the same time. An effective balance can be achieved using various methods, depending on the situation. This study aims to incorporate the various algorithms used in the last 15 years to reach a satisfying balance between time and cost, including meta-heuristics, heuristics, and exact algorithms. A comprehensive view of the problems associated with time-cost optimization will be provided throughout this review to assist new and challenging researchers who are interested in this type of research. For this purpose, we have reviewed some objective functions and uncertainty techniques that could be employed in time-cost balancing problems. The literature review tables contain a variety of columns, including uncertainties such as fuzzy, probabilistic, interval, robust, and objective functions, along with cost and time, for the investigation of various types of balance issues. In the conclusion of this article, we will show the results of our literature review table using different types of graphic diagrams. For each main column of the table, we will show various types of diagrams to make the results easier to understand.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook\",\"authors\":\"Maedeh Hosseinpour, E. Roghanian, G. Weber\",\"doi\":\"10.5267/j.jpm.2023.4.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The time-cost optimization is amongst the most critical fields, which has an extensive range of implementation in project scheduling. Achieving a satisfactory balance between these factors can lead to an efficient construction project by reducing both the length of the project and costs at the same time. An effective balance can be achieved using various methods, depending on the situation. This study aims to incorporate the various algorithms used in the last 15 years to reach a satisfying balance between time and cost, including meta-heuristics, heuristics, and exact algorithms. A comprehensive view of the problems associated with time-cost optimization will be provided throughout this review to assist new and challenging researchers who are interested in this type of research. For this purpose, we have reviewed some objective functions and uncertainty techniques that could be employed in time-cost balancing problems. The literature review tables contain a variety of columns, including uncertainties such as fuzzy, probabilistic, interval, robust, and objective functions, along with cost and time, for the investigation of various types of balance issues. In the conclusion of this article, we will show the results of our literature review table using different types of graphic diagrams. For each main column of the table, we will show various types of diagrams to make the results easier to understand.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2023.4.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2023.4.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

时间成本优化是项目调度中最关键的问题之一,在项目调度中有着广泛的应用范围。在这些因素之间取得令人满意的平衡可以通过同时减少项目的长度和成本来实现高效的建设项目。根据具体情况,可以使用各种方法实现有效的平衡。本研究旨在整合过去15年来使用的各种算法,以达到时间和成本之间令人满意的平衡,包括元启发式,启发式和精确算法。本文将全面介绍与时间成本优化相关的问题,以帮助对这类研究感兴趣的新研究人员和具有挑战性的研究人员。为此,我们回顾了一些可用于时间成本平衡问题的目标函数和不确定性技术。文献回顾表包含各种列,包括不确定性,如模糊、概率、区间、鲁棒和目标函数,以及成本和时间,用于调查各种类型的平衡问题。在本文的结论中,我们将使用不同类型的图形图表来显示我们的文献综述表的结果。对于表的每个主要列,我们将显示各种类型的图表,以使结果更容易理解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook
The time-cost optimization is amongst the most critical fields, which has an extensive range of implementation in project scheduling. Achieving a satisfactory balance between these factors can lead to an efficient construction project by reducing both the length of the project and costs at the same time. An effective balance can be achieved using various methods, depending on the situation. This study aims to incorporate the various algorithms used in the last 15 years to reach a satisfying balance between time and cost, including meta-heuristics, heuristics, and exact algorithms. A comprehensive view of the problems associated with time-cost optimization will be provided throughout this review to assist new and challenging researchers who are interested in this type of research. For this purpose, we have reviewed some objective functions and uncertainty techniques that could be employed in time-cost balancing problems. The literature review tables contain a variety of columns, including uncertainties such as fuzzy, probabilistic, interval, robust, and objective functions, along with cost and time, for the investigation of various types of balance issues. In the conclusion of this article, we will show the results of our literature review table using different types of graphic diagrams. For each main column of the table, we will show various types of diagrams to make the results easier to understand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1