{"title":"选择项目的分包商,同时尽量减少合同罚款和成功费的结算","authors":"T. Blaszczyk, P. Błaszczyk","doi":"10.1109/IEEM.2013.6962698","DOIUrl":null,"url":null,"abstract":"Most of today's projects are interdisciplinary and requires the involvement of contractors that specialize in different types of works. In various circumstances, it may be advisable to minimize their multiplicity or their diversification. In some cases it may be desirable to meet certain characteristics by contractors for selected tasks. The aim of this paper is to determine the model of selection of contractors in complex project from the point of view of the project owner or general contractor. As a methodological basis we use the multi-criterial decision model assigning each task to specific contractors in the project with the function of distribution of penalties arising from delayed completion and potential benefits in the event of early termination of the project.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"2 2","pages":"1689-1693"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Selection of sub-contractors of the project while minimizing settlements of contractual penalties and success fees\",\"authors\":\"T. Blaszczyk, P. Błaszczyk\",\"doi\":\"10.1109/IEEM.2013.6962698\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Most of today's projects are interdisciplinary and requires the involvement of contractors that specialize in different types of works. In various circumstances, it may be advisable to minimize their multiplicity or their diversification. In some cases it may be desirable to meet certain characteristics by contractors for selected tasks. The aim of this paper is to determine the model of selection of contractors in complex project from the point of view of the project owner or general contractor. As a methodological basis we use the multi-criterial decision model assigning each task to specific contractors in the project with the function of distribution of penalties arising from delayed completion and potential benefits in the event of early termination of the project.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"2 2\",\"pages\":\"1689-1693\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962698\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962698","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Selection of sub-contractors of the project while minimizing settlements of contractual penalties and success fees
Most of today's projects are interdisciplinary and requires the involvement of contractors that specialize in different types of works. In various circumstances, it may be advisable to minimize their multiplicity or their diversification. In some cases it may be desirable to meet certain characteristics by contractors for selected tasks. The aim of this paper is to determine the model of selection of contractors in complex project from the point of view of the project owner or general contractor. As a methodological basis we use the multi-criterial decision model assigning each task to specific contractors in the project with the function of distribution of penalties arising from delayed completion and potential benefits in the event of early termination of the project.