{"title":"Pearsall Austin Chalk水平井完井技术","authors":"C. D. Pope, P. Handren","doi":"10.2118/20682-PA","DOIUrl":null,"url":null,"abstract":"Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"20 3-4 1","pages":"144-148"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Completion techniques for horizontal wells in the Pearsall Austin Chalk\",\"authors\":\"C. D. Pope, P. Handren\",\"doi\":\"10.2118/20682-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"20 3-4 1\",\"pages\":\"144-148\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/20682-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20682-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Completion techniques for horizontal wells in the Pearsall Austin Chalk
Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed