Pearsall Austin Chalk水平井完井技术

C. D. Pope, P. Handren
{"title":"Pearsall Austin Chalk水平井完井技术","authors":"C. D. Pope, P. Handren","doi":"10.2118/20682-PA","DOIUrl":null,"url":null,"abstract":"Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"20 3-4 1","pages":"144-148"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Completion techniques for horizontal wells in the Pearsall Austin Chalk\",\"authors\":\"C. D. Pope, P. Handren\",\"doi\":\"10.2118/20682-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"20 3-4 1\",\"pages\":\"144-148\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/20682-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20682-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

Oryx能源公司使用了三种基本完井技术以及它们的不同组合,在Pearsall Austin Chalk完成了20口水平井的完井作业。所选择的完井方法是基于一套通用的指导方针。此外,还回顾了设备选择和各种类型的修井作业
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Completion techniques for horizontal wells in the Pearsall Austin Chalk
Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Phase splitting of wet steam in annular flow through a horizontal impacting tee Corrosion performance of welded CRA-lined pipes for flowlines Breaker concentrations required to improve the permeability of proppant packs damaged by concentrated linear and borate-crosslinked fracturing fluids Incorporation of 2D fluid flow into a pseudo-3D hydraulic fracturing simulator Application of curable resin-coated proppants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1