{"title":"运营成本多元化对基础设施BOT项目投资决策的影响及期权博弈分析","authors":"YANG Yi, GUO Mingliang, HU Wenxiu","doi":"10.1016/S1872-583X(07)60009-6","DOIUrl":null,"url":null,"abstract":"<div><p>According to the option characteristic of environmental protection infrastructure build-operate-transfer (BOT) project, this paper sets the concession term as the government's decision variable and adopts option game method to analyze the investment behavior of the project company under the condition that the government makes the concession term certain, and establishes the decision-making models both for the concession term and the investment cost of environmental protection infrastructure. The result shows that to introduce the growth option makes the concession term more reasonable, and the project company enhances the investment in construction cost to benefit itself. Consequently, the time of government operating the environmental protection infrastructure will be lengthened.</p></div>","PeriodicalId":100240,"journal":{"name":"China Population, Resources and Environment","volume":"17 2","pages":"Pages 32-35"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1872-583X(07)60009-6","citationCount":"8","resultStr":"{\"title\":\"Effect of Diversification of Operation Cost on Infrastructure BOT Project Investment Decision and Analysis of Option Game\",\"authors\":\"YANG Yi, GUO Mingliang, HU Wenxiu\",\"doi\":\"10.1016/S1872-583X(07)60009-6\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>According to the option characteristic of environmental protection infrastructure build-operate-transfer (BOT) project, this paper sets the concession term as the government's decision variable and adopts option game method to analyze the investment behavior of the project company under the condition that the government makes the concession term certain, and establishes the decision-making models both for the concession term and the investment cost of environmental protection infrastructure. The result shows that to introduce the growth option makes the concession term more reasonable, and the project company enhances the investment in construction cost to benefit itself. Consequently, the time of government operating the environmental protection infrastructure will be lengthened.</p></div>\",\"PeriodicalId\":100240,\"journal\":{\"name\":\"China Population, Resources and Environment\",\"volume\":\"17 2\",\"pages\":\"Pages 32-35\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1872-583X(07)60009-6\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"China Population, Resources and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1872583X07600096\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"China Population, Resources and Environment","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1872583X07600096","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Effect of Diversification of Operation Cost on Infrastructure BOT Project Investment Decision and Analysis of Option Game
According to the option characteristic of environmental protection infrastructure build-operate-transfer (BOT) project, this paper sets the concession term as the government's decision variable and adopts option game method to analyze the investment behavior of the project company under the condition that the government makes the concession term certain, and establishes the decision-making models both for the concession term and the investment cost of environmental protection infrastructure. The result shows that to introduce the growth option makes the concession term more reasonable, and the project company enhances the investment in construction cost to benefit itself. Consequently, the time of government operating the environmental protection infrastructure will be lengthened.