电压暂降对梅磨矿抽水电气系统的影响

W. Boonkird, S. Premrudeepreechacharn, Y. Baghzouz
{"title":"电压暂降对梅磨矿抽水电气系统的影响","authors":"W. Boonkird, S. Premrudeepreechacharn, Y. Baghzouz","doi":"10.1109/ICHQP.2018.8378839","DOIUrl":null,"url":null,"abstract":"This paper studies the voltage sag on a distribution system that delivers power to an array of water pumps in Mae Moh mine. Mae Moh mine is an open pit mine, therefore, electric pump is a crucial equipment for pumping water out of mine. DIgSILENT's PowerFactory software is used for modeling the electrical system and assessing the severity of voltage sag that is caused by sequential starting of large motors as this might affect some sensitive loads at various buses. Possible solutions are described for the worse cases where the voltage dip is considered unacceptable.","PeriodicalId":6506,"journal":{"name":"2018 18th International Conference on Harmonics and Quality of Power (ICHQP)","volume":"30 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of voltage sag on electrical system for water pumping of Mae Moh mine\",\"authors\":\"W. Boonkird, S. Premrudeepreechacharn, Y. Baghzouz\",\"doi\":\"10.1109/ICHQP.2018.8378839\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies the voltage sag on a distribution system that delivers power to an array of water pumps in Mae Moh mine. Mae Moh mine is an open pit mine, therefore, electric pump is a crucial equipment for pumping water out of mine. DIgSILENT's PowerFactory software is used for modeling the electrical system and assessing the severity of voltage sag that is caused by sequential starting of large motors as this might affect some sensitive loads at various buses. Possible solutions are described for the worse cases where the voltage dip is considered unacceptable.\",\"PeriodicalId\":6506,\"journal\":{\"name\":\"2018 18th International Conference on Harmonics and Quality of Power (ICHQP)\",\"volume\":\"30 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 18th International Conference on Harmonics and Quality of Power (ICHQP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICHQP.2018.8378839\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 18th International Conference on Harmonics and Quality of Power (ICHQP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHQP.2018.8378839","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了梅莫矿输配电系统的电压凹陷问题。Mae Moh矿为露天矿山,因此电泵是矿井抽水的关键设备。DIgSILENT的PowerFactory软件用于对电气系统进行建模,并评估由大型电机顺序启动引起的电压下降的严重程度,因为这可能会影响各种总线上的一些敏感负载。在电压下降被认为不可接受的情况下,描述了可能的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Impact of voltage sag on electrical system for water pumping of Mae Moh mine
This paper studies the voltage sag on a distribution system that delivers power to an array of water pumps in Mae Moh mine. Mae Moh mine is an open pit mine, therefore, electric pump is a crucial equipment for pumping water out of mine. DIgSILENT's PowerFactory software is used for modeling the electrical system and assessing the severity of voltage sag that is caused by sequential starting of large motors as this might affect some sensitive loads at various buses. Possible solutions are described for the worse cases where the voltage dip is considered unacceptable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Adaptive segmentation and machine learning based potential DR capacity analysis Harmonic resonance risk of massive ultra fast charging station grid integration A general process recommended by CIGRE WG C4.27 for benchmarking power quality performance in transmission systems On the limitations of harmonic modeling with measured inputs - a case study Analysis of replacement from disconnecting switch to circuit breaker for 500 kV line shunt reactor
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1