新冠肺炎疫情对建筑行业的影响分析

Q4 Physics and Astronomy Neutron News Pub Date : 2022-01-31 DOI:10.29138/neutron.v21i02.135
Liliana Hannes, Julistyana Tistogondo
{"title":"新冠肺炎疫情对建筑行业的影响分析","authors":"Liliana Hannes, Julistyana Tistogondo","doi":"10.29138/neutron.v21i02.135","DOIUrl":null,"url":null,"abstract":"Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. \nThe research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. \nThe results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"2 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis Of The Impact Of The Covid-19 Pandemic On The Construction Industry Sector\",\"authors\":\"Liliana Hannes, Julistyana Tistogondo\",\"doi\":\"10.29138/neutron.v21i02.135\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. \\nThe research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. \\nThe results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.\",\"PeriodicalId\":39014,\"journal\":{\"name\":\"Neutron News\",\"volume\":\"2 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Neutron News\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29138/neutron.v21i02.135\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Physics and Astronomy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/neutron.v21i02.135","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 1

摘要

印尼加快基础设施建设是一件好事,但这并非没有问题。2019冠状病毒病大流行是一个具有巨大全球影响的问题,尤其是在印度尼西亚,特别是在建筑行业。Soedono Madiun医院建设项目是受新冠肺炎疫情直接影响的建设项目之一。因此,本研究的目的是通过对Soedono Madiun医院建设项目的案例研究来回顾和分析covid-19大流行对建筑项目的影响,并在Soedono医院建设项目的案例研究中找出covid-19大流行对建筑项目影响最大的项目。麦迪逊。确定covid-19大流行对成本和时间方面的最大影响的研究方法是借助Microsoft Excel的多元线性回归分析法。本研究中使用的其他数据分析方法是在测试问卷时使用的效度和信度检验。本研究的数据分析结果表明,有7个自变量影响因变量,即规划与项目实现的适宜性,时间方面为y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4,成本方面为y=87,009 -0.0006x5-0.001x6-0.0002x7。由这个方程可以看出,在时间方面对因变量影响最大的自变量是自变量X3,即由于建筑材料延迟到达导致的时间计划变化量为1.014,而在成本方面是自变量X6,即由于不稳定导致的成本变化量。建筑材料价格为0.001。因此,希望有一个项目管理处理的重点是最具影响力的变量,即建筑材料。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis Of The Impact Of The Covid-19 Pandemic On The Construction Industry Sector
Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
期刊最新文献
Thermoreversible Gels of Hollow Silica Nanorod Dispersions Unveiling Nanoparticle Spin Structures Through Polarized Neutron Scattering Stefan U. Egelhaaf (1963–2023) Paul Burlet (1939–2023) Rapid Prediction of Inelastic Neutron Scattering Spectra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1