在共同负载下并联mitl电流的增加

E. V. Grabovskiĭ, S. L. Nedoseev, V. E. Pichugin, V. Smirnov, V.V. Zajivikhin, B.M. Oleynik
{"title":"在共同负载下并联mitl电流的增加","authors":"E. V. Grabovskiĭ, S. L. Nedoseev, V. E. Pichugin, V. Smirnov, V.V. Zajivikhin, B.M. Oleynik","doi":"10.1109/PPC.1995.599745","DOIUrl":null,"url":null,"abstract":"A parallel current addition at power facilities is carried out according to two main schemes as follows: (1) adding in generator water part installations \"SATURN\" and \"PBFA-II\" (SNL, USA); and (2) convolution in vacuum part \"Angara-5-1\" (TRINITI, Russia). The second scheme may be important for increasing of facilities' size, because it allows a decrease in vacuum isolator dimensions. The proposed paper deals with some experimental results on the parallel current addition at a common load. A jitter of parallel current addition is a significant effect of \"Angara-5-1\" operation. Quantitatively it is a square mean of time delay of modules T1-T8, when voltage of every module achieves 0.1 of its maximum value. These moments may be determined with +/-2 ns' accuracy.","PeriodicalId":11163,"journal":{"name":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1995-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Parallel MITLs current addition at common load\",\"authors\":\"E. V. Grabovskiĭ, S. L. Nedoseev, V. E. Pichugin, V. Smirnov, V.V. Zajivikhin, B.M. Oleynik\",\"doi\":\"10.1109/PPC.1995.599745\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A parallel current addition at power facilities is carried out according to two main schemes as follows: (1) adding in generator water part installations \\\"SATURN\\\" and \\\"PBFA-II\\\" (SNL, USA); and (2) convolution in vacuum part \\\"Angara-5-1\\\" (TRINITI, Russia). The second scheme may be important for increasing of facilities' size, because it allows a decrease in vacuum isolator dimensions. The proposed paper deals with some experimental results on the parallel current addition at a common load. A jitter of parallel current addition is a significant effect of \\\"Angara-5-1\\\" operation. Quantitatively it is a square mean of time delay of modules T1-T8, when voltage of every module achieves 0.1 of its maximum value. These moments may be determined with +/-2 ns' accuracy.\",\"PeriodicalId\":11163,\"journal\":{\"name\":\"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPC.1995.599745\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.1995.599745","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力设施并联加电流主要有以下两种方案:(1)在发电机组水部分安装“SATURN”和“PBFA-II”(SNL, USA);(2)真空部分“Angara-5-1”(TRINITI,俄罗斯)的卷积。第二种方案对于增加设备尺寸可能很重要,因为它允许真空隔离器尺寸的减小。本文讨论了在普通负载下并联加电流的一些实验结果。并联电流叠加的抖动是“安加拉-5-1”操作的重要影响。定量为各模块电压达到其最大值0.1时模块T1-T8延时的平方平均值。这些力矩可以用+/-2 ns的精度来确定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Parallel MITLs current addition at common load
A parallel current addition at power facilities is carried out according to two main schemes as follows: (1) adding in generator water part installations "SATURN" and "PBFA-II" (SNL, USA); and (2) convolution in vacuum part "Angara-5-1" (TRINITI, Russia). The second scheme may be important for increasing of facilities' size, because it allows a decrease in vacuum isolator dimensions. The proposed paper deals with some experimental results on the parallel current addition at a common load. A jitter of parallel current addition is a significant effect of "Angara-5-1" operation. Quantitatively it is a square mean of time delay of modules T1-T8, when voltage of every module achieves 0.1 of its maximum value. These moments may be determined with +/-2 ns' accuracy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modeling of DM1 POS and load performance Investigations of compact high-current accelerators RADAN-303 synchronization with nanosecond accuracy Experimental results from a coaxial virtual cathode oscillator The 67 MJ, 50 kV capacitor bank for the high-power iodine laser of the facility ISKRA-5: description and experience An investigation of trigatron breakdown by two different mechanisms
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1