{"title":"变容量比例批量调度问题中多周期设置时间的显式建模","authors":"Waldemar Kaczmarczyk","doi":"10.24425/acs.2021.139735","DOIUrl":null,"url":null,"abstract":"Small bucket models with many short fictitious micro-periods ensure high-quality schedules in multi-level systems, i.e., with multiple stages or dependent demand. In such models, setup times longer than a single period are, however, more likely. This paper presents new mixed-integer programming models for the proportional lot-sizing and scheduling problem (PLSP) with setup operations overlapping multiple periods with variable capacity. A new model is proposed that explicitly determines periods overlapped by each setup operation and the time spent on setup execution during each period. The model assumes that most periods have the same length; however, a few of them are shorter, and the time interval determined by two consecutive shorter periods is always longer than a single setup operation. The computational experiments show that the new model requires a significantly smaller computation effort than known models.","PeriodicalId":48654,"journal":{"name":"Archives of Control Sciences","volume":"1 1","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Explicit modeling of multi-period setup times in proportional lot-sizing and scheduling problem with variable capacity\",\"authors\":\"Waldemar Kaczmarczyk\",\"doi\":\"10.24425/acs.2021.139735\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Small bucket models with many short fictitious micro-periods ensure high-quality schedules in multi-level systems, i.e., with multiple stages or dependent demand. In such models, setup times longer than a single period are, however, more likely. This paper presents new mixed-integer programming models for the proportional lot-sizing and scheduling problem (PLSP) with setup operations overlapping multiple periods with variable capacity. A new model is proposed that explicitly determines periods overlapped by each setup operation and the time spent on setup execution during each period. The model assumes that most periods have the same length; however, a few of them are shorter, and the time interval determined by two consecutive shorter periods is always longer than a single setup operation. The computational experiments show that the new model requires a significantly smaller computation effort than known models.\",\"PeriodicalId\":48654,\"journal\":{\"name\":\"Archives of Control Sciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-07-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Control Sciences\",\"FirstCategoryId\":\"94\",\"ListUrlMain\":\"https://doi.org/10.24425/acs.2021.139735\",\"RegionNum\":4,\"RegionCategory\":\"计算机科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"AUTOMATION & CONTROL SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Control Sciences","FirstCategoryId":"94","ListUrlMain":"https://doi.org/10.24425/acs.2021.139735","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"AUTOMATION & CONTROL SYSTEMS","Score":null,"Total":0}
Explicit modeling of multi-period setup times in proportional lot-sizing and scheduling problem with variable capacity
Small bucket models with many short fictitious micro-periods ensure high-quality schedules in multi-level systems, i.e., with multiple stages or dependent demand. In such models, setup times longer than a single period are, however, more likely. This paper presents new mixed-integer programming models for the proportional lot-sizing and scheduling problem (PLSP) with setup operations overlapping multiple periods with variable capacity. A new model is proposed that explicitly determines periods overlapped by each setup operation and the time spent on setup execution during each period. The model assumes that most periods have the same length; however, a few of them are shorter, and the time interval determined by two consecutive shorter periods is always longer than a single setup operation. The computational experiments show that the new model requires a significantly smaller computation effort than known models.
期刊介绍:
Archives of Control Sciences welcomes for consideration papers on topics of significance in broadly understood control science and related areas, including: basic control theory, optimal control, optimization methods, control of complex systems, mathematical modeling of dynamic and control systems, expert and decision support systems and diverse methods of knowledge modelling and representing uncertainty (by stochastic, set-valued, fuzzy or rough set methods, etc.), robotics and flexible manufacturing systems. Related areas that are covered include information technology, parallel and distributed computations, neural networks and mathematical biomedicine, mathematical economics, applied game theory, financial engineering, business informatics and other similar fields.