高孔隙度煤矸石路基充填过程应力特征研究

IF 0.6 4区 工程技术 Q4 MECHANICS Journal of Theoretical and Applied Mechanics Pub Date : 2023-07-24 DOI:10.15632/jtam-pl/168989
Bing Hui, Y. Hui, X. Zhang, Wenjun Zhang, Sheng Yan, G. Men
{"title":"高孔隙度煤矸石路基充填过程应力特征研究","authors":"Bing Hui, Y. Hui, X. Zhang, Wenjun Zhang, Sheng Yan, G. Men","doi":"10.15632/jtam-pl/168989","DOIUrl":null,"url":null,"abstract":"By analyzing geological conditions of a coal gangue filling roadbed, stress characteristics and settlement changes during the filling process of the coal gangue roadbed are simulated. The following conclusions are drawn: (1) As height of the coal gangue filling increases, the stress and settlement of each part will also increase. (2) During the filling process, the vertical stress acts as the first principal stress, and the stress and strain at the centerline of the roadbed are 10 times that of the roadbed. (3) The final stable value of uneven settlement of the coal gangue roadbed is 18.85mm. (4) The monitoring results indicate that the settlement of the coal gangue roadbed is stable, and the settlement amount is small ensuring safety of the roadbed.","PeriodicalId":49980,"journal":{"name":"Journal of Theoretical and Applied Mechanics","volume":"18 1","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2023-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on stress characteristics of high-porosity coal gangue subgrade during filling process\",\"authors\":\"Bing Hui, Y. Hui, X. Zhang, Wenjun Zhang, Sheng Yan, G. Men\",\"doi\":\"10.15632/jtam-pl/168989\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"By analyzing geological conditions of a coal gangue filling roadbed, stress characteristics and settlement changes during the filling process of the coal gangue roadbed are simulated. The following conclusions are drawn: (1) As height of the coal gangue filling increases, the stress and settlement of each part will also increase. (2) During the filling process, the vertical stress acts as the first principal stress, and the stress and strain at the centerline of the roadbed are 10 times that of the roadbed. (3) The final stable value of uneven settlement of the coal gangue roadbed is 18.85mm. (4) The monitoring results indicate that the settlement of the coal gangue roadbed is stable, and the settlement amount is small ensuring safety of the roadbed.\",\"PeriodicalId\":49980,\"journal\":{\"name\":\"Journal of Theoretical and Applied Mechanics\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2023-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Theoretical and Applied Mechanics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.15632/jtam-pl/168989\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MECHANICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Theoretical and Applied Mechanics","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15632/jtam-pl/168989","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MECHANICS","Score":null,"Total":0}
引用次数: 0

摘要

通过对某煤矸石充填路基地质条件的分析,模拟了煤矸石路基充填过程中的应力特征及沉降变化。得出以下结论:(1)随着煤矸石充填高度的增加,各部位的应力和沉降也会增大。(2)充填过程中,竖向应力为第一主应力,路基中心线处的应力应变为路基的10倍。(3)煤矸石路基不均匀沉降最终稳定值为18.85mm。(4)监测结果表明,煤矸石路基沉降稳定,沉降量小,保证了路基的安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Study on stress characteristics of high-porosity coal gangue subgrade during filling process
By analyzing geological conditions of a coal gangue filling roadbed, stress characteristics and settlement changes during the filling process of the coal gangue roadbed are simulated. The following conclusions are drawn: (1) As height of the coal gangue filling increases, the stress and settlement of each part will also increase. (2) During the filling process, the vertical stress acts as the first principal stress, and the stress and strain at the centerline of the roadbed are 10 times that of the roadbed. (3) The final stable value of uneven settlement of the coal gangue roadbed is 18.85mm. (4) The monitoring results indicate that the settlement of the coal gangue roadbed is stable, and the settlement amount is small ensuring safety of the roadbed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.40
自引率
14.30%
发文量
22
审稿时长
6 months
期刊介绍: The scope of JTAM contains: - solid mechanics - fluid mechanics - fluid structures interactions - stability and vibrations systems - robotic and control systems - mechanics of materials - dynamics of machines, vehicles and flying structures - inteligent systems - nanomechanics - biomechanics - computational mechanics
期刊最新文献
Research on vibration characteristics of motorized spindle at high speed based on power flow Laboratory study of the dynamic fracture in pre-drilled boreholes and the associated host rock behaviours Unsteady body force model for rotating stall in axial compressor with various inlet conditions Bending of a sandwich beam with an individual functionally graded core Ultrahigh frequency vibration control in a piezoelectric phononic crystal beam at the nanoscale considering surface effects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1