{"title":"关键路径与Leontief投入产出表的供应链建模","authors":"G. Light","doi":"10.34257/gjsfrfvol22is1pg1","DOIUrl":null,"url":null,"abstract":"We formulate a supply-chain problem by:(1)casting it in the model of critical-path analysis as defined by predecessor/successor relations, and (2)allowing for mutual dependency among the activity nodes and applying Leontief’s input-output structure.","PeriodicalId":12547,"journal":{"name":"Global Journal of Science Frontier Research","volume":"25 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modeling Supply Chains by Critical Paths and Leontief Input-Output Table\",\"authors\":\"G. Light\",\"doi\":\"10.34257/gjsfrfvol22is1pg1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We formulate a supply-chain problem by:(1)casting it in the model of critical-path analysis as defined by predecessor/successor relations, and (2)allowing for mutual dependency among the activity nodes and applying Leontief’s input-output structure.\",\"PeriodicalId\":12547,\"journal\":{\"name\":\"Global Journal of Science Frontier Research\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Global Journal of Science Frontier Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34257/gjsfrfvol22is1pg1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Science Frontier Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34257/gjsfrfvol22is1pg1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modeling Supply Chains by Critical Paths and Leontief Input-Output Table
We formulate a supply-chain problem by:(1)casting it in the model of critical-path analysis as defined by predecessor/successor relations, and (2)allowing for mutual dependency among the activity nodes and applying Leontief’s input-output structure.