{"title":"TES-3 -安装在自行履带式车辆上的可移动核电站","authors":"N. Naumenko, I. M. Mokhireva","doi":"10.3897/nucet.8.89356","DOIUrl":null,"url":null,"abstract":"Until the mid-1950s, scientists and engineers at the Obninsk Institute of Physics and Power Engineering (IPPE) had worked out a number of unique projects that served as the foundation for the development of domestic and world nuclear power engineering. The list of these projects includes, in particular, TES-3, the first mobile nuclear power plant, which has become a symbol of small-scale nuclear power engineering, a historical achievement of Russian scientists, and part of the heritage of the City of Peaceful Atom.\n TES-3, a demonstration and experimental plant, being one of the possible nuclear power sources for remote areas, was a mobile power-generating unit consisting of four tracked platforms with a reactor unit equipped with a water-cooled and water-moderated reactor with a 1.5 MW turbogenerator. The “self-propelled uranium-fueled machine” was created in record-breaking time due to the scale and cooperation of the project participants under the scientific guidance of the Laboratory V staff. The plant showed reliability in operation, good controllability, safety and maintainability. Over the entire operating period in the power generation mode, TES-3 worked for about 1300 hours without any radiation accidents. After the completion of the first fuel campaign in 1965, the reactor was shut down, but the idea of mobile low-capacity large-component nuclear power plants was further developed in the form of mobile nuclear power plants of the next generation.","PeriodicalId":100969,"journal":{"name":"Nuclear Energy and Technology","volume":"32 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"TES-3 – transportable nuclear power plant mounted on self-propelled tracked vehicles\",\"authors\":\"N. Naumenko, I. M. Mokhireva\",\"doi\":\"10.3897/nucet.8.89356\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Until the mid-1950s, scientists and engineers at the Obninsk Institute of Physics and Power Engineering (IPPE) had worked out a number of unique projects that served as the foundation for the development of domestic and world nuclear power engineering. The list of these projects includes, in particular, TES-3, the first mobile nuclear power plant, which has become a symbol of small-scale nuclear power engineering, a historical achievement of Russian scientists, and part of the heritage of the City of Peaceful Atom.\\n TES-3, a demonstration and experimental plant, being one of the possible nuclear power sources for remote areas, was a mobile power-generating unit consisting of four tracked platforms with a reactor unit equipped with a water-cooled and water-moderated reactor with a 1.5 MW turbogenerator. The “self-propelled uranium-fueled machine” was created in record-breaking time due to the scale and cooperation of the project participants under the scientific guidance of the Laboratory V staff. The plant showed reliability in operation, good controllability, safety and maintainability. Over the entire operating period in the power generation mode, TES-3 worked for about 1300 hours without any radiation accidents. After the completion of the first fuel campaign in 1965, the reactor was shut down, but the idea of mobile low-capacity large-component nuclear power plants was further developed in the form of mobile nuclear power plants of the next generation.\",\"PeriodicalId\":100969,\"journal\":{\"name\":\"Nuclear Energy and Technology\",\"volume\":\"32 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Energy and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3897/nucet.8.89356\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Energy and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3897/nucet.8.89356","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

直到20世纪50年代中期,奥布宁斯克物理与动力工程研究所(IPPE)的科学家和工程师已经制定了一些独特的项目,为国内和世界核电工程的发展奠定了基础。这些项目特别包括TES-3,这是第一座移动核电站,已成为小型核电工程的象征,是俄罗斯科学家的历史性成就,也是“和平原子之城”遗产的一部分。示范和实验装置TES-3是偏远地区可能的核动力来源之一,它是一个移动发电装置,由四个履带式平台和一个装有水冷和水慢化反应堆的反应堆装置组成,该反应堆装置装有一台1.5兆瓦的涡轮发电机。在五实验室工作人员的科学指导下,由于项目参与者的规模和合作,“自行式铀燃料机器”在破纪录的时间内被创造出来。该装置运行可靠,具有良好的可控性、安全性和可维护性。在整个发电模式运行期间,TES-3运行了约1300小时,未发生任何辐射事故。在1965年第一次燃料运动完成后,反应堆被关闭,但移动低容量大组件核电站的想法在下一代移动核电站的形式中得到进一步发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
TES-3 – transportable nuclear power plant mounted on self-propelled tracked vehicles
Until the mid-1950s, scientists and engineers at the Obninsk Institute of Physics and Power Engineering (IPPE) had worked out a number of unique projects that served as the foundation for the development of domestic and world nuclear power engineering. The list of these projects includes, in particular, TES-3, the first mobile nuclear power plant, which has become a symbol of small-scale nuclear power engineering, a historical achievement of Russian scientists, and part of the heritage of the City of Peaceful Atom. TES-3, a demonstration and experimental plant, being one of the possible nuclear power sources for remote areas, was a mobile power-generating unit consisting of four tracked platforms with a reactor unit equipped with a water-cooled and water-moderated reactor with a 1.5 MW turbogenerator. The “self-propelled uranium-fueled machine” was created in record-breaking time due to the scale and cooperation of the project participants under the scientific guidance of the Laboratory V staff. The plant showed reliability in operation, good controllability, safety and maintainability. Over the entire operating period in the power generation mode, TES-3 worked for about 1300 hours without any radiation accidents. After the completion of the first fuel campaign in 1965, the reactor was shut down, but the idea of mobile low-capacity large-component nuclear power plants was further developed in the form of mobile nuclear power plants of the next generation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.40
自引率
0.00%
发文量
0
期刊最新文献
Potential role of nuclear power in a carbon-free world Corrosion resistance of chromium coating on the inner surface of EP823-Sh steel cladding A brief investigation of the dose field virtual simulation tools for reactor decommissioning and preliminary design for the HWRR reactor in China Assessment of the possibility for large-scale 238Pu production in a VVER-1000 power reactor A computer code for optimizing the neutronics model parameters based on results of reactor physics experiments
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1