在磨铣作业中防止结垢和腐蚀:案例研究

Tanhee Galindo
{"title":"在磨铣作业中防止结垢和腐蚀:案例研究","authors":"Tanhee Galindo","doi":"10.2118/195205-MS","DOIUrl":null,"url":null,"abstract":"\n Case studies of mill-out operations in the Permian Basin which evaluate chemical programs and processes used. Results show how existing processes and chemicals used or lack thereof, can affect equipment and undo the preventative chemical treatments used during the hydraulic fracturing process.\n The study looks at field water testing performed during various mill-out operations and considered workover rig vs coiled tubing, equipment set up, water & chemicals used, and operational challenges. Water analyses were completed on the injection water and returns at various intervals of the mill-out. Effectiveness of chemical treatment was also monitored when biocide was used.\n Field case studies of horizontal wells for two operators in the Permian Basin are presented. Wells were milled-out utilizing workover rigs or coiled tubing units. Testing results show the impact of equipment setup and operations process on the water quality and efficiency of the chemicals used. Water fouling was prevalent in all cases, with coiled tubing jobs showing the highest degree of water contamination and chemical inefficiency. Changes in the water treatment program during operations showed significant improvement and sustainable results. Potential corrosion of the work string due to water fouling and water composition were also observed. The effects of changes to chemical dosages were also monitored. This was important because it identified operational improvements that can reduce equipment replacement costs, reduce chemical overuse and help protect wells from fouling due to high bacteria.\n These case study provides a comprehensive review of mill-out operations, which provides guidelines for improving chemical efficiency and potential of extending life of the work string.","PeriodicalId":11150,"journal":{"name":"Day 2 Wed, April 10, 2019","volume":"30 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prevent Fouling and Corrosion During Mill-Out Operations: Case Studies\",\"authors\":\"Tanhee Galindo\",\"doi\":\"10.2118/195205-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Case studies of mill-out operations in the Permian Basin which evaluate chemical programs and processes used. Results show how existing processes and chemicals used or lack thereof, can affect equipment and undo the preventative chemical treatments used during the hydraulic fracturing process.\\n The study looks at field water testing performed during various mill-out operations and considered workover rig vs coiled tubing, equipment set up, water & chemicals used, and operational challenges. Water analyses were completed on the injection water and returns at various intervals of the mill-out. Effectiveness of chemical treatment was also monitored when biocide was used.\\n Field case studies of horizontal wells for two operators in the Permian Basin are presented. Wells were milled-out utilizing workover rigs or coiled tubing units. Testing results show the impact of equipment setup and operations process on the water quality and efficiency of the chemicals used. Water fouling was prevalent in all cases, with coiled tubing jobs showing the highest degree of water contamination and chemical inefficiency. Changes in the water treatment program during operations showed significant improvement and sustainable results. Potential corrosion of the work string due to water fouling and water composition were also observed. The effects of changes to chemical dosages were also monitored. This was important because it identified operational improvements that can reduce equipment replacement costs, reduce chemical overuse and help protect wells from fouling due to high bacteria.\\n These case study provides a comprehensive review of mill-out operations, which provides guidelines for improving chemical efficiency and potential of extending life of the work string.\",\"PeriodicalId\":11150,\"journal\":{\"name\":\"Day 2 Wed, April 10, 2019\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, April 10, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/195205-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, April 10, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195205-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

二叠纪盆地磨铣作业的案例研究,评估化学方案和使用的工艺。结果表明,现有的工艺和化学品的使用或缺乏会影响设备,并破坏水力压裂过程中使用的预防性化学处理。该研究着眼于在各种磨铣作业中进行的现场水测试,并考虑了修井机与连续油管、设备设置、水和化学品的使用以及操作挑战。在磨铣的不同时间间隔,对注入水和回水量进行了水分析。当使用杀菌剂时,还监测了化学处理的有效性。介绍了二叠盆地两家作业者水平井的现场案例研究。利用修井机或连续油管设备进行磨铣作业。测试结果显示了设备设置和操作流程对水质和所用化学品效率的影响。在所有情况下,水污染都很普遍,连续油管作业显示出最高程度的水污染和化学效率低下。在运营过程中,水处理程序的变化显示出显著的改善和可持续的结果。还观察到由于水垢和水成分导致的工作管柱的潜在腐蚀。还监测了化学剂量变化的影响。这很重要,因为它确定了操作改进,可以降低设备更换成本,减少化学品的过度使用,并有助于保护井免受高细菌污染。这些案例研究提供了磨铣作业的全面回顾,为提高化学效率和延长工作管柱寿命的潜力提供了指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Prevent Fouling and Corrosion During Mill-Out Operations: Case Studies
Case studies of mill-out operations in the Permian Basin which evaluate chemical programs and processes used. Results show how existing processes and chemicals used or lack thereof, can affect equipment and undo the preventative chemical treatments used during the hydraulic fracturing process. The study looks at field water testing performed during various mill-out operations and considered workover rig vs coiled tubing, equipment set up, water & chemicals used, and operational challenges. Water analyses were completed on the injection water and returns at various intervals of the mill-out. Effectiveness of chemical treatment was also monitored when biocide was used. Field case studies of horizontal wells for two operators in the Permian Basin are presented. Wells were milled-out utilizing workover rigs or coiled tubing units. Testing results show the impact of equipment setup and operations process on the water quality and efficiency of the chemicals used. Water fouling was prevalent in all cases, with coiled tubing jobs showing the highest degree of water contamination and chemical inefficiency. Changes in the water treatment program during operations showed significant improvement and sustainable results. Potential corrosion of the work string due to water fouling and water composition were also observed. The effects of changes to chemical dosages were also monitored. This was important because it identified operational improvements that can reduce equipment replacement costs, reduce chemical overuse and help protect wells from fouling due to high bacteria. These case study provides a comprehensive review of mill-out operations, which provides guidelines for improving chemical efficiency and potential of extending life of the work string.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Exploring the Capability of Temperature-Only Analysis for Zonal Flow Quantification Field Operations Strategy for Installing Beam Pumping Units at 660 Wells in Just six Months Application of Radial Jet Drilling Technique with Gyro System to Enhance Reservoir Potential in Mature Sand Stone Reservoir in Assam-Arakan Basin Candidate Selection to Execution: A Detailed Case Study A Case Study on Treating Oil Contaminants and Heavy Metal of Produced Water Through Phytoremediation Using Reed Bed Technology: A Success Story of 15 Years Operation of Heglig Oil Field of Sudan Prevent Fouling and Corrosion During Mill-Out Operations: Case Studies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1