柬埔寨贡察和下塞山2号水电流域的利益分享

Prachvuthy Men , Vathana Thun , Soriya Yin , Louis Lebel
{"title":"柬埔寨贡察和下塞山2号水电流域的利益分享","authors":"Prachvuthy Men ,&nbsp;Vathana Thun ,&nbsp;Soriya Yin ,&nbsp;Louis Lebel","doi":"10.1016/j.wrr.2014.10.004","DOIUrl":null,"url":null,"abstract":"<div><p>The purpose of this study was to explore the institutions underlying different forms of benefit sharing in hydropower projects in Cambodia, through detailed analysis of two case studies: Kamchay and the Lower Sesan 2 hydro-dams. Promises on paper were compared with how benefit sharing was implemented in practice. The study found that, first, compensation and resettlement were a common, if minimalist, form of benefit sharing in Cambodia. Other forms of benefit sharing, such as environmental impact management and allocation of community development funds, were mentioned in both the EIA report and investment agreements, but have never been implemented. Second, at the national and sub-national levels, there are no comprehensive guidelines for benefit sharing, nor is there a supporting legal framework. Benefit sharing and compensation policies have been developed on a project-by-project basis. Third, hydro-dam projects do not prioritize providing electricity services to affected communities: no preferential electricity rate was given. Fourth, inter-ministerial structures have been introduced, which could improve the integration of activities, but instead have just slowed down decision-making. This study advances our knowledge on how benefits from hydro-dam projects are shared (and not shared), in practice, with prior residents of hydropower watersheds and other affected stakeholders in Cambodia.</p></div>","PeriodicalId":101278,"journal":{"name":"Water Resources and Rural Development","volume":"4 ","pages":"Pages 40-53"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.wrr.2014.10.004","citationCount":"15","resultStr":"{\"title\":\"Benefit sharing from Kamchay and Lower Sesan 2 hydropower watersheds in Cambodia\",\"authors\":\"Prachvuthy Men ,&nbsp;Vathana Thun ,&nbsp;Soriya Yin ,&nbsp;Louis Lebel\",\"doi\":\"10.1016/j.wrr.2014.10.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The purpose of this study was to explore the institutions underlying different forms of benefit sharing in hydropower projects in Cambodia, through detailed analysis of two case studies: Kamchay and the Lower Sesan 2 hydro-dams. Promises on paper were compared with how benefit sharing was implemented in practice. The study found that, first, compensation and resettlement were a common, if minimalist, form of benefit sharing in Cambodia. Other forms of benefit sharing, such as environmental impact management and allocation of community development funds, were mentioned in both the EIA report and investment agreements, but have never been implemented. Second, at the national and sub-national levels, there are no comprehensive guidelines for benefit sharing, nor is there a supporting legal framework. Benefit sharing and compensation policies have been developed on a project-by-project basis. Third, hydro-dam projects do not prioritize providing electricity services to affected communities: no preferential electricity rate was given. Fourth, inter-ministerial structures have been introduced, which could improve the integration of activities, but instead have just slowed down decision-making. This study advances our knowledge on how benefits from hydro-dam projects are shared (and not shared), in practice, with prior residents of hydropower watersheds and other affected stakeholders in Cambodia.</p></div>\",\"PeriodicalId\":101278,\"journal\":{\"name\":\"Water Resources and Rural Development\",\"volume\":\"4 \",\"pages\":\"Pages 40-53\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/j.wrr.2014.10.004\",\"citationCount\":\"15\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Water Resources and Rural Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2212608214000242\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Water Resources and Rural Development","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2212608214000242","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15

摘要

本研究的目的是通过对两个案例的详细分析,探讨柬埔寨水电项目中不同形式利益分享的制度,这两个案例是:甘察和下塞山2号水电站。研究人员将纸面上的承诺与利益分享在实践中的实施情况进行了比较。研究发现,首先,补偿和重新安置在柬埔寨是一种普遍的利益分享形式,尽管这种形式很少。环评报告和投资协议中都提到了环境影响管理和社区发展资金分配等其他形式的利益分享,但从未实施。第二,在国家和地方层面,既没有全面的惠益分享指导方针,也没有配套的法律框架。每个项目都制定了利益分享和补偿政策。第三,水电站项目没有优先为受影响社区提供电力服务:没有给予优惠电价。第四,已经建立了部际结构,它可以改善活动的一体化,但反而放慢了决策的速度。这项研究提高了我们对水电项目的收益如何在实践中与柬埔寨水电流域的先前居民和其他受影响的利益相关者共享(或不共享)的认识。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Benefit sharing from Kamchay and Lower Sesan 2 hydropower watersheds in Cambodia

The purpose of this study was to explore the institutions underlying different forms of benefit sharing in hydropower projects in Cambodia, through detailed analysis of two case studies: Kamchay and the Lower Sesan 2 hydro-dams. Promises on paper were compared with how benefit sharing was implemented in practice. The study found that, first, compensation and resettlement were a common, if minimalist, form of benefit sharing in Cambodia. Other forms of benefit sharing, such as environmental impact management and allocation of community development funds, were mentioned in both the EIA report and investment agreements, but have never been implemented. Second, at the national and sub-national levels, there are no comprehensive guidelines for benefit sharing, nor is there a supporting legal framework. Benefit sharing and compensation policies have been developed on a project-by-project basis. Third, hydro-dam projects do not prioritize providing electricity services to affected communities: no preferential electricity rate was given. Fourth, inter-ministerial structures have been introduced, which could improve the integration of activities, but instead have just slowed down decision-making. This study advances our knowledge on how benefits from hydro-dam projects are shared (and not shared), in practice, with prior residents of hydropower watersheds and other affected stakeholders in Cambodia.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Exploring water security and water demand determinants in rural areas. The case of canton Cotacachi in Ecuador Bacterial contamination of drinking water and food utensils: Impacts of piped water on child health in north-western Bangladesh A critical mass analysis of community-based financing of water services in rural Kenya Comparison of informal rainwater harvesting systems to conventional water sources in terms of microbiological water quality The economic contribution of a recreational fishery in a remote rural economy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1