{"title":"热泵集成了热水供应和供热的换热过程","authors":"Yu. A. Selikhov, V. Kotsarenko, O. V. Kostenko","doi":"10.31472/ttpe.3.2019.6","DOIUrl":null,"url":null,"abstract":"A developed and implemented project of replacing a universal boiler with a fuel oil burner for a dual-circuit solar installation for hot water supply and a «ground-water» heat pump for heating a private house is presented. A system automation scheme has been developed using a workstation and technical automation tools have been selected.","PeriodicalId":23079,"journal":{"name":"Thermophysics and Thermal Power Engineering","volume":"37 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"INTEGRATION OF THE HEAT PUMP HEAT EXCHANGE PROCESS FOR HOT WATER SUPPLY AND HEATING\",\"authors\":\"Yu. A. Selikhov, V. Kotsarenko, O. V. Kostenko\",\"doi\":\"10.31472/ttpe.3.2019.6\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A developed and implemented project of replacing a universal boiler with a fuel oil burner for a dual-circuit solar installation for hot water supply and a «ground-water» heat pump for heating a private house is presented. A system automation scheme has been developed using a workstation and technical automation tools have been selected.\",\"PeriodicalId\":23079,\"journal\":{\"name\":\"Thermophysics and Thermal Power Engineering\",\"volume\":\"37 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Thermophysics and Thermal Power Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31472/ttpe.3.2019.6\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Thermophysics and Thermal Power Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31472/ttpe.3.2019.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
INTEGRATION OF THE HEAT PUMP HEAT EXCHANGE PROCESS FOR HOT WATER SUPPLY AND HEATING
A developed and implemented project of replacing a universal boiler with a fuel oil burner for a dual-circuit solar installation for hot water supply and a «ground-water» heat pump for heating a private house is presented. A system automation scheme has been developed using a workstation and technical automation tools have been selected.