{"title":"大型项目交付风险分析的动态系统方法","authors":"Zhen Chen, P. Boateng, S. Ogunlana","doi":"10.1680/jmapl.18.00041","DOIUrl":null,"url":null,"abstract":"This paper describes a dynamic systems approach to quantitative risk assessment and simulation in megaprojects with regard to social, technical, economic, environmental and political issues relatin...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A dynamic system approach to risk analysis for megaproject delivery\",\"authors\":\"Zhen Chen, P. Boateng, S. Ogunlana\",\"doi\":\"10.1680/jmapl.18.00041\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a dynamic systems approach to quantitative risk assessment and simulation in megaprojects with regard to social, technical, economic, environmental and political issues relatin...\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jmapl.18.00041\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jmapl.18.00041","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
A dynamic system approach to risk analysis for megaproject delivery
This paper describes a dynamic systems approach to quantitative risk assessment and simulation in megaprojects with regard to social, technical, economic, environmental and political issues relatin...