双层列车的负荷规划与排序问题

Moritz Ruf , Jean-François Cordeau , Emma Frejinger
{"title":"双层列车的负荷规划与排序问题","authors":"Moritz Ruf ,&nbsp;Jean-François Cordeau ,&nbsp;Emma Frejinger","doi":"10.1016/j.jrtpm.2022.100337","DOIUrl":null,"url":null,"abstract":"<div><p>This paper addresses the integrated load planning and sequencing problem (LPSP) for double-stack trains. This decision-making problem occurs in intermodal terminals and consists in assigning containers from a storage area to slots on railcars of outbound trains and in determining the loading sequence of the handling equipment. Even though this a relevant operational problem, it has seen no attention in the operations research<span> literature so far. Prior models either focus on single-stack railcars or treat the load planning and sequencing separately. By extending prior work on load planning, we propose two different integer linear programming formulations. We show by an extensive numerical study that we are able to solve instances with up to 50 containers with a commercial general-purpose solver in less than 20 min. A case study based on real data provided by the Canadian National Railway Company highlights that the LPSP can reduce the number of container handlings in intermodal terminals compared to sequential solutions by on average 11.3% and 16.5% for gantry cranes and reach stackers, respectively.</span></p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"23 ","pages":"Article 100337"},"PeriodicalIF":2.6000,"publicationDate":"2022-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The load planning and sequencing problem for double-stack trains\",\"authors\":\"Moritz Ruf ,&nbsp;Jean-François Cordeau ,&nbsp;Emma Frejinger\",\"doi\":\"10.1016/j.jrtpm.2022.100337\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper addresses the integrated load planning and sequencing problem (LPSP) for double-stack trains. This decision-making problem occurs in intermodal terminals and consists in assigning containers from a storage area to slots on railcars of outbound trains and in determining the loading sequence of the handling equipment. Even though this a relevant operational problem, it has seen no attention in the operations research<span> literature so far. Prior models either focus on single-stack railcars or treat the load planning and sequencing separately. By extending prior work on load planning, we propose two different integer linear programming formulations. We show by an extensive numerical study that we are able to solve instances with up to 50 containers with a commercial general-purpose solver in less than 20 min. A case study based on real data provided by the Canadian National Railway Company highlights that the LPSP can reduce the number of container handlings in intermodal terminals compared to sequential solutions by on average 11.3% and 16.5% for gantry cranes and reach stackers, respectively.</span></p></div>\",\"PeriodicalId\":51821,\"journal\":{\"name\":\"Journal of Rail Transport Planning & Management\",\"volume\":\"23 \",\"pages\":\"Article 100337\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2022-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Rail Transport Planning & Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2210970622000373\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"TRANSPORTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Rail Transport Planning & Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2210970622000373","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

摘要

研究了双层列车的综合负荷规划与排序问题。这种决策问题发生在多式联运码头,包括将集装箱从存储区域分配到出站列车的轨道车厢槽,以及确定装卸设备的装载顺序。尽管这是一个相关的运筹学问题,但迄今为止在运筹学文献中还没有引起重视。先前的模型要么关注单堆栈轨道车辆,要么单独处理负载规划和排序。通过对负荷规划的扩展,我们提出了两种不同的整数线性规划公式。我们通过广泛的数值研究表明,我们能够在不到20分钟的时间内用商业通用求解器解决多达50个集装箱的实例。基于加拿大国家铁路公司提供的真实数据的案例研究强调,与顺序解决方案相比,LPSP可以减少多式联运码头的集装箱处理量,龙门起重机和到达式堆垛机分别平均减少11.3%和16.5%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The load planning and sequencing problem for double-stack trains

This paper addresses the integrated load planning and sequencing problem (LPSP) for double-stack trains. This decision-making problem occurs in intermodal terminals and consists in assigning containers from a storage area to slots on railcars of outbound trains and in determining the loading sequence of the handling equipment. Even though this a relevant operational problem, it has seen no attention in the operations research literature so far. Prior models either focus on single-stack railcars or treat the load planning and sequencing separately. By extending prior work on load planning, we propose two different integer linear programming formulations. We show by an extensive numerical study that we are able to solve instances with up to 50 containers with a commercial general-purpose solver in less than 20 min. A case study based on real data provided by the Canadian National Railway Company highlights that the LPSP can reduce the number of container handlings in intermodal terminals compared to sequential solutions by on average 11.3% and 16.5% for gantry cranes and reach stackers, respectively.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.10
自引率
8.10%
发文量
41
期刊最新文献
A MILP model to improve the robustness of a railway timetable by retiming and rerouting in a complex bottleneck area A decomposition approach to solve the individual railway crew Re-planning problem A Bi-objective model and a branch-and-price-and-cut solution method for the railroad blocking problem in hazardous material transportation Relationships between service quality and customer satisfaction in rail freight transportation: A structural equation modeling approach The evaluation of competition effect on rail fares using the difference-in-difference method through symmetric and lagged spans
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1