投资于减少持续审查库存模型的交货期随机性

Yigal Gerchak, Mahmut Parlar
{"title":"投资于减少持续审查库存模型的交货期随机性","authors":"Yigal Gerchak,&nbsp;Mahmut Parlar","doi":"10.1016/0167-188X(91)90032-W","DOIUrl":null,"url":null,"abstract":"<div><p>We consider the selection of optimal lead time variability in continuous review inventory models. The variability level is optimized jointly with the lot size and reorder point, where lower variability can be achieved at an extra cost. Low variabilities may correspond to more reliable sources or production processes, and their attainment is one of the implicit goals of JIT logistics. We analyze the resulting tri-variate models, providing sufficient conditions for joint convexity, and hence unique optimum, an algorithm and illustrative examples.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 2","pages":"Pages 191-197"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90032-W","citationCount":"35","resultStr":"{\"title\":\"Investing in reducing lead-time randomness in continuous-review inventory models\",\"authors\":\"Yigal Gerchak,&nbsp;Mahmut Parlar\",\"doi\":\"10.1016/0167-188X(91)90032-W\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>We consider the selection of optimal lead time variability in continuous review inventory models. The variability level is optimized jointly with the lot size and reorder point, where lower variability can be achieved at an extra cost. Low variabilities may correspond to more reliable sources or production processes, and their attainment is one of the implicit goals of JIT logistics. We analyze the resulting tri-variate models, providing sufficient conditions for joint convexity, and hence unique optimum, an algorithm and illustrative examples.</p></div>\",\"PeriodicalId\":100476,\"journal\":{\"name\":\"Engineering Costs and Production Economics\",\"volume\":\"21 2\",\"pages\":\"Pages 191-197\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-188X(91)90032-W\",\"citationCount\":\"35\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Costs and Production Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167188X9190032W\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190032W","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 35

摘要

我们考虑了连续评审库存模型中最优交货期可变性的选择。可变性水平与批量大小和再订货点一起优化,在这些地方,可以以额外的成本实现较低的可变性。低可变性可能与更可靠的来源或生产过程相对应,它们的实现是JIT物流的隐含目标之一。我们分析了所得的三变量模型,提供了联合凸性的充分条件,从而提供了唯一最优,算法和示例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investing in reducing lead-time randomness in continuous-review inventory models

We consider the selection of optimal lead time variability in continuous review inventory models. The variability level is optimized jointly with the lot size and reorder point, where lower variability can be achieved at an extra cost. Low variabilities may correspond to more reliable sources or production processes, and their attainment is one of the implicit goals of JIT logistics. We analyze the resulting tri-variate models, providing sufficient conditions for joint convexity, and hence unique optimum, an algorithm and illustrative examples.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Bicriterion jobshop scheduling with total flowtime and sum of squared lateness Investment justification in flexible manufacturing systems Using multiple time-series analysis, of assembly-line production of automobile engines — a case study Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1