A. Hasani, Seyed Mohammad Hassan Hosseini, S. Sana
{"title":"具有不相关的并行机器和依赖于机器的工艺阶段的灵活流程车间的调度:最大完工时间和生产成本之间的权衡","authors":"A. Hasani, Seyed Mohammad Hassan Hosseini, S. Sana","doi":"10.1016/j.samod.2022.100010","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":101193,"journal":{"name":"Sustainability Analytics and Modeling","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: trade-off between Makespan and production costs\",\"authors\":\"A. Hasani, Seyed Mohammad Hassan Hosseini, S. Sana\",\"doi\":\"10.1016/j.samod.2022.100010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":101193,\"journal\":{\"name\":\"Sustainability Analytics and Modeling\",\"volume\":\"8 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainability Analytics and Modeling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/j.samod.2022.100010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainability Analytics and Modeling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/j.samod.2022.100010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: trade-off between Makespan and production costs