意大利能源转型框架内电力转气试点工厂的经济分析

Corine Nsangwe Businge, P. Grisi, A. Gelmini
{"title":"意大利能源转型框架内电力转气试点工厂的经济分析","authors":"Corine Nsangwe Businge, P. Grisi, A. Gelmini","doi":"10.23919/AEIT50178.2020.9241156","DOIUrl":null,"url":null,"abstract":"This work aims at evaluating the economic sustainability of a power-to-gas pilot plant, with reference to the Italian context and to the medium-long term. The study is based on the energy scenarios of the Italian National Climate and Energy Plan (NECP) and assumes that the plant participates in the ancillary services markets. The study assesses the economic barriers and the main factors affecting the competitiveness of power-to-gas. The results show that, while power-to-gas being a technically feasible solution to support the flexibility of the power system, the economics of the pilot plant are heavily affected by the cost of components and operating cost. The results also highlight the need for suitable policies and financial support aiming at enhancing favourable operating conditions for pilot applications of the technology.","PeriodicalId":6689,"journal":{"name":"2020 AEIT International Annual Conference (AEIT)","volume":"307 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic analysis of a Power-to-Gas pilot plant within the Italian energy transition framework\",\"authors\":\"Corine Nsangwe Businge, P. Grisi, A. Gelmini\",\"doi\":\"10.23919/AEIT50178.2020.9241156\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work aims at evaluating the economic sustainability of a power-to-gas pilot plant, with reference to the Italian context and to the medium-long term. The study is based on the energy scenarios of the Italian National Climate and Energy Plan (NECP) and assumes that the plant participates in the ancillary services markets. The study assesses the economic barriers and the main factors affecting the competitiveness of power-to-gas. The results show that, while power-to-gas being a technically feasible solution to support the flexibility of the power system, the economics of the pilot plant are heavily affected by the cost of components and operating cost. The results also highlight the need for suitable policies and financial support aiming at enhancing favourable operating conditions for pilot applications of the technology.\",\"PeriodicalId\":6689,\"journal\":{\"name\":\"2020 AEIT International Annual Conference (AEIT)\",\"volume\":\"307 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 AEIT International Annual Conference (AEIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/AEIT50178.2020.9241156\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT50178.2020.9241156","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这项工作的目的是根据意大利的情况和中长期情况,评估电力制气试点工厂的经济可持续性。该研究基于意大利国家气候和能源计划(NECP)的能源情景,并假设电厂参与了辅助服务市场。本研究评估了影响电改气竞争力的经济障碍和主要因素。结果表明,虽然电转气是一种技术上可行的解决方案,以支持电力系统的灵活性,但中试工厂的经济性受到组件成本和运行成本的严重影响。研究结果还强调需要适当的政策和财政支持,旨在为该技术的试点应用改善有利的操作条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Economic analysis of a Power-to-Gas pilot plant within the Italian energy transition framework
This work aims at evaluating the economic sustainability of a power-to-gas pilot plant, with reference to the Italian context and to the medium-long term. The study is based on the energy scenarios of the Italian National Climate and Energy Plan (NECP) and assumes that the plant participates in the ancillary services markets. The study assesses the economic barriers and the main factors affecting the competitiveness of power-to-gas. The results show that, while power-to-gas being a technically feasible solution to support the flexibility of the power system, the economics of the pilot plant are heavily affected by the cost of components and operating cost. The results also highlight the need for suitable policies and financial support aiming at enhancing favourable operating conditions for pilot applications of the technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Spectral and Discriminant Analysis Based Classification of Faults in Induction Machines Overview of distribution grid test systems for benchmarking of power system analyses Exploit GaN FET technologies in high efficiency flyback topologies: pros and cons of different architectures Modeling the OHL vulnerability to strong wind New flexibility services and technologies: ENEL experiences in Italy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1