{"title":"离散时间一阶多智能体系统约束控制的精确延迟裕度","authors":"Ruofei Wang, Dan Ma","doi":"10.1109/YAC.2019.8787679","DOIUrl":null,"url":null,"abstract":"In this paper, we investigate the containment control problem of discrete-time first-order unstable multi-agent systems with undirected fixed communication topologies and uncertain communication delays. In particular, we focus on the delay margin achieved by two kinds of containment protocols, one is $P$-type and the other is $PD$-type. We provide the exact expression of the delay margin and its explicit bound by optimizing the network coupling strengths within their allowable ranges. The results show that for a strictly unstable discrete-time first-order multi-agent system, its delay margin depends on the unstable pole location of each agent, as well as on the eigen-ratio of the network topologies. In addition, the delay margin can be enlarged by $PD$-type containment protocol with respect to $P$-type one. Finally, two numerical examples are given to illustrate the effectiveness of the results.","PeriodicalId":6669,"journal":{"name":"2019 34rd Youth Academic Annual Conference of Chinese Association of Automation (YAC)","volume":"6 1","pages":"700-705"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exact Delay Margin on Containment Control for Discrete-Time First-Order Multi-Agent Systems\",\"authors\":\"Ruofei Wang, Dan Ma\",\"doi\":\"10.1109/YAC.2019.8787679\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we investigate the containment control problem of discrete-time first-order unstable multi-agent systems with undirected fixed communication topologies and uncertain communication delays. In particular, we focus on the delay margin achieved by two kinds of containment protocols, one is $P$-type and the other is $PD$-type. We provide the exact expression of the delay margin and its explicit bound by optimizing the network coupling strengths within their allowable ranges. The results show that for a strictly unstable discrete-time first-order multi-agent system, its delay margin depends on the unstable pole location of each agent, as well as on the eigen-ratio of the network topologies. In addition, the delay margin can be enlarged by $PD$-type containment protocol with respect to $P$-type one. Finally, two numerical examples are given to illustrate the effectiveness of the results.\",\"PeriodicalId\":6669,\"journal\":{\"name\":\"2019 34rd Youth Academic Annual Conference of Chinese Association of Automation (YAC)\",\"volume\":\"6 1\",\"pages\":\"700-705\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 34rd Youth Academic Annual Conference of Chinese Association of Automation (YAC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/YAC.2019.8787679\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 34rd Youth Academic Annual Conference of Chinese Association of Automation (YAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/YAC.2019.8787679","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Exact Delay Margin on Containment Control for Discrete-Time First-Order Multi-Agent Systems
In this paper, we investigate the containment control problem of discrete-time first-order unstable multi-agent systems with undirected fixed communication topologies and uncertain communication delays. In particular, we focus on the delay margin achieved by two kinds of containment protocols, one is $P$-type and the other is $PD$-type. We provide the exact expression of the delay margin and its explicit bound by optimizing the network coupling strengths within their allowable ranges. The results show that for a strictly unstable discrete-time first-order multi-agent system, its delay margin depends on the unstable pole location of each agent, as well as on the eigen-ratio of the network topologies. In addition, the delay margin can be enlarged by $PD$-type containment protocol with respect to $P$-type one. Finally, two numerical examples are given to illustrate the effectiveness of the results.