基于遗传算法的柔性作业车间机械与自动导引车的综合调度

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2022-01-01 DOI:10.5267/j.ijiec.2022.2.002
I. Chaudhry, A. F. Rafique, I. Elbadawi, M. Aichouni, Muhammed Usman, Mohamed Boujelbene, A. Boudjemline
{"title":"基于遗传算法的柔性作业车间机械与自动导引车的综合调度","authors":"I. Chaudhry, A. F. Rafique, I. Elbadawi, M. Aichouni, Muhammed Usman, Mohamed Boujelbene, A. Boudjemline","doi":"10.5267/j.ijiec.2022.2.002","DOIUrl":null,"url":null,"abstract":"In this research integrated scheduling of machines and automated guided vehicles (AGVs) in a flexible job shop environment is addressed. The scheduling literature generally ignores the transportation of jobs between the machines and when considered typically assumes an unlimited number of AGVs. In order to comply with Industry 4.0 requirements, today’s manufacturing systems make use of AGVs to transport jobs between the machines. The addressed problem involves simultaneous assignment of operations to one of the alternative machines, determining the sequence of operations on each machine and assignment of transportation operations between machines to an available AGV. We present a Microsoft Excel® spreadsheet-based solution for the problem. Evolver®, a proprietary GA is used for the optimization. The GA routine works as an add-in to the spreadsheet environment. The flexible job shop model is developed in Microsoft Excel® spreadsheet. The assignment of AGV is independent of the GA routine and is done by the spreadsheet model while the GA finds the assignment of operations to the machines and then finds the best sequence of operations on each machine. Computational analysis demonstrates that the proposed method can effectively and efficiently solve a wide range of problems with reasonable accuracy. Benchmark problems from the literature are used to highlight the effectiveness and efficiency of the proposed implementation. In most of the cases the proposed implementation can find the best-known solution found by previous studies.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"7 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Integrated scheduling of machines and automated guided vehicles (AGVs) in flexible job shop environment using genetic algorithms\",\"authors\":\"I. Chaudhry, A. F. Rafique, I. Elbadawi, M. Aichouni, Muhammed Usman, Mohamed Boujelbene, A. Boudjemline\",\"doi\":\"10.5267/j.ijiec.2022.2.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this research integrated scheduling of machines and automated guided vehicles (AGVs) in a flexible job shop environment is addressed. The scheduling literature generally ignores the transportation of jobs between the machines and when considered typically assumes an unlimited number of AGVs. In order to comply with Industry 4.0 requirements, today’s manufacturing systems make use of AGVs to transport jobs between the machines. The addressed problem involves simultaneous assignment of operations to one of the alternative machines, determining the sequence of operations on each machine and assignment of transportation operations between machines to an available AGV. We present a Microsoft Excel® spreadsheet-based solution for the problem. Evolver®, a proprietary GA is used for the optimization. The GA routine works as an add-in to the spreadsheet environment. The flexible job shop model is developed in Microsoft Excel® spreadsheet. The assignment of AGV is independent of the GA routine and is done by the spreadsheet model while the GA finds the assignment of operations to the machines and then finds the best sequence of operations on each machine. Computational analysis demonstrates that the proposed method can effectively and efficiently solve a wide range of problems with reasonable accuracy. Benchmark problems from the literature are used to highlight the effectiveness and efficiency of the proposed implementation. In most of the cases the proposed implementation can find the best-known solution found by previous studies.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"7 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.2.002\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.2.002","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 10

摘要

研究了柔性作业车间环境下机械与自动导引车的集成调度问题。调度文献通常忽略了机器之间的作业传输,并且通常假设agv的数量是无限的。为了符合工业4.0的要求,今天的制造系统使用agv在机器之间传输作业。所解决的问题包括将操作同时分配给可选机器之一,确定每台机器上的操作顺序,并将机器之间的运输操作分配给可用的AGV。我们提出了一个基于Microsoft Excel®电子表格的解决方案。Evolver®,一个专有的遗传算法被用于优化。GA例程作为电子表格环境的外接程序。柔性作业车间模型在Microsoft Excel®电子表格中开发。AGV的分配独立于遗传算法例程,由电子表格模型完成,而遗传算法找到机器的操作分配,然后在每台机器上找到最佳的操作顺序。计算分析表明,该方法能以合理的精度有效地解决各种问题。从文献中的基准问题被用来突出提出的实施的有效性和效率。在大多数情况下,提出的实现可以找到以前研究中发现的最著名的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Integrated scheduling of machines and automated guided vehicles (AGVs) in flexible job shop environment using genetic algorithms
In this research integrated scheduling of machines and automated guided vehicles (AGVs) in a flexible job shop environment is addressed. The scheduling literature generally ignores the transportation of jobs between the machines and when considered typically assumes an unlimited number of AGVs. In order to comply with Industry 4.0 requirements, today’s manufacturing systems make use of AGVs to transport jobs between the machines. The addressed problem involves simultaneous assignment of operations to one of the alternative machines, determining the sequence of operations on each machine and assignment of transportation operations between machines to an available AGV. We present a Microsoft Excel® spreadsheet-based solution for the problem. Evolver®, a proprietary GA is used for the optimization. The GA routine works as an add-in to the spreadsheet environment. The flexible job shop model is developed in Microsoft Excel® spreadsheet. The assignment of AGV is independent of the GA routine and is done by the spreadsheet model while the GA finds the assignment of operations to the machines and then finds the best sequence of operations on each machine. Computational analysis demonstrates that the proposed method can effectively and efficiently solve a wide range of problems with reasonable accuracy. Benchmark problems from the literature are used to highlight the effectiveness and efficiency of the proposed implementation. In most of the cases the proposed implementation can find the best-known solution found by previous studies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1