{"title":"项目组合管理的一些实际方面","authors":"Lorenzo R. Schiavina","doi":"10.1016/0377-841X(79)90047-0","DOIUrl":null,"url":null,"abstract":"<div><p>A heuristic approach to the problem of portfolio management is introduced as a dynamic extension of the portfolio selection problem. Both term and option contracts are fitted into the proposed scheme in order to achieve a realistic model for practical purposes.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 2","pages":"Pages 349-353"},"PeriodicalIF":0.0000,"publicationDate":"1979-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90047-0","citationCount":"0","resultStr":"{\"title\":\"Some practical aspects of portfolio management\",\"authors\":\"Lorenzo R. Schiavina\",\"doi\":\"10.1016/0377-841X(79)90047-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>A heuristic approach to the problem of portfolio management is introduced as a dynamic extension of the portfolio selection problem. Both term and option contracts are fitted into the proposed scheme in order to achieve a realistic model for practical purposes.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":\"4 2\",\"pages\":\"Pages 349-353\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(79)90047-0\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X79900470\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X79900470","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A heuristic approach to the problem of portfolio management is introduced as a dynamic extension of the portfolio selection problem. Both term and option contracts are fitted into the proposed scheme in order to achieve a realistic model for practical purposes.