重点建设项目进度偏差监控体系构建研究

Zhao Hui, Wang Xue-qing
{"title":"重点建设项目进度偏差监控体系构建研究","authors":"Zhao Hui, Wang Xue-qing","doi":"10.1109/MACE.2010.5535975","DOIUrl":null,"url":null,"abstract":"Whether the key construction projects' progress is ongoing expectably or not will have important influence on the economic development. Aiming at the supervisors'(Microscopic level) insufficiency of the ability in grasping the project progress deviation, based on the balance theory, using the modern computer technology, utilizing the Delphi method and interval estimation method, the paper constructs a progress deviation surveillance system of the key construction projects in the macroscopic level(implemented by official organizations), which will provide powerful safeguard for completing these key construction projects.","PeriodicalId":6349,"journal":{"name":"2010 International Conference on Mechanic Automation and Control Engineering","volume":"48 1","pages":"5074-5078"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study on constructing surveillance system of progress deviation in the key construction projects\",\"authors\":\"Zhao Hui, Wang Xue-qing\",\"doi\":\"10.1109/MACE.2010.5535975\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Whether the key construction projects' progress is ongoing expectably or not will have important influence on the economic development. Aiming at the supervisors'(Microscopic level) insufficiency of the ability in grasping the project progress deviation, based on the balance theory, using the modern computer technology, utilizing the Delphi method and interval estimation method, the paper constructs a progress deviation surveillance system of the key construction projects in the macroscopic level(implemented by official organizations), which will provide powerful safeguard for completing these key construction projects.\",\"PeriodicalId\":6349,\"journal\":{\"name\":\"2010 International Conference on Mechanic Automation and Control Engineering\",\"volume\":\"48 1\",\"pages\":\"5074-5078\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Mechanic Automation and Control Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MACE.2010.5535975\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Mechanic Automation and Control Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MACE.2010.5535975","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

重点建设项目的进度能否按计划进行,将对经济发展产生重要影响。针对监理人员(微观层面)对工程进度偏差把握能力不足的问题,基于平衡理论,运用现代计算机技术,运用德尔菲法和区间估计法,构建了宏观层面(由官方机构实施)的重点建设项目进度偏差监控系统,为重点建设项目的完成提供有力保障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Study on constructing surveillance system of progress deviation in the key construction projects
Whether the key construction projects' progress is ongoing expectably or not will have important influence on the economic development. Aiming at the supervisors'(Microscopic level) insufficiency of the ability in grasping the project progress deviation, based on the balance theory, using the modern computer technology, utilizing the Delphi method and interval estimation method, the paper constructs a progress deviation surveillance system of the key construction projects in the macroscopic level(implemented by official organizations), which will provide powerful safeguard for completing these key construction projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on the framework of eco-city planning and development standard in Wuhan Effect of Y on microstructure of laser clad coatings reinforced by in situ synthesized TiB and TiC Preparation of Pd-B/TiO2 amorphous alloy and its catalytic performance on the thermal decomposition of ammonium perchlorate The new shape forming technology of composite concrete machine tool beds Matching unorganized data sets using multi-scale feature points
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1