{"title":"评估限制短路电流措施的技术和经济模型","authors":"M. R. Zagidullin, S. Eroshenko, A. Egorov, A. Khalyasmaa","doi":"10.1109/EICONRUS.2018.8317220","DOIUrl":null,"url":null,"abstract":"Currently, the problem of high levels of short-circuit currents on buses of substations of 110 kV and above is urgent; therefore, it is necessary to develop measures to limit them. The reasons for that are the constant development of the electric grid infrastructure and the growth of generating capacities. Breaking capacity of a large amount of switching equipment does not correspond to the calculated levels of short-circuit currents. Replacement of existing circuit breakers is expensive, because of which it is advisable to consider alternative technical solutions, including the implementation of the stationary sectioning of the electric network, which in turn requires consideration of a number of criteria for influencing the power system mode. As a solution to this problem, the paper proposes a model for evaluating measures to limit short-circuit currents in the power system.","PeriodicalId":6562,"journal":{"name":"2018 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus)","volume":"14 1","pages":"845-849"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Technical and economic model for evaluating measures to limit short-circuit currents\",\"authors\":\"M. R. Zagidullin, S. Eroshenko, A. Egorov, A. Khalyasmaa\",\"doi\":\"10.1109/EICONRUS.2018.8317220\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Currently, the problem of high levels of short-circuit currents on buses of substations of 110 kV and above is urgent; therefore, it is necessary to develop measures to limit them. The reasons for that are the constant development of the electric grid infrastructure and the growth of generating capacities. Breaking capacity of a large amount of switching equipment does not correspond to the calculated levels of short-circuit currents. Replacement of existing circuit breakers is expensive, because of which it is advisable to consider alternative technical solutions, including the implementation of the stationary sectioning of the electric network, which in turn requires consideration of a number of criteria for influencing the power system mode. As a solution to this problem, the paper proposes a model for evaluating measures to limit short-circuit currents in the power system.\",\"PeriodicalId\":6562,\"journal\":{\"name\":\"2018 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus)\",\"volume\":\"14 1\",\"pages\":\"845-849\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EICONRUS.2018.8317220\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EICONRUS.2018.8317220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前,110千伏及以上变电站母线短路电流大的问题迫在眉睫;因此,有必要制定限制措施。其原因是电网基础设施的不断发展和发电能力的增长。大量开关设备的分断能力与短路电流的计算值不符。更换现有的断路器是昂贵的,因此建议考虑替代技术解决方案,包括实施电网的固定部分,这反过来又需要考虑影响电力系统模式的一些标准。为了解决这一问题,本文提出了一个评估电力系统短路电流限制措施的模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Technical and economic model for evaluating measures to limit short-circuit currents
Currently, the problem of high levels of short-circuit currents on buses of substations of 110 kV and above is urgent; therefore, it is necessary to develop measures to limit them. The reasons for that are the constant development of the electric grid infrastructure and the growth of generating capacities. Breaking capacity of a large amount of switching equipment does not correspond to the calculated levels of short-circuit currents. Replacement of existing circuit breakers is expensive, because of which it is advisable to consider alternative technical solutions, including the implementation of the stationary sectioning of the electric network, which in turn requires consideration of a number of criteria for influencing the power system mode. As a solution to this problem, the paper proposes a model for evaluating measures to limit short-circuit currents in the power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The modeling of emergency oil spills in GIS Load balancing in cloud computing Practical characterisation of the piezo electric properties of a 3K T300 carbon fibre for impact sensoring Modelling of a photovoltaic array using Analog System Lab Kit Pro board Design of optimum configuration of a hybrid power system for Abertay University campus
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1