20年独立油气审计:特立尼达和多巴哥故事

C. Welsh
{"title":"20年独立油气审计:特立尼达和多巴哥故事","authors":"C. Welsh","doi":"10.2118/200985-ms","DOIUrl":null,"url":null,"abstract":"\n Over the 20 year period from 2001 to 2020, the Ministry of Energy and Energy Industries (MEEI) of Trinidad and Tobago commissioned 19 gas and 3 oil audits conducted by independent consultants. Trinidad and Tobago's natural gas Technically Recoverable Resources (TRR) moved from a P1+C1 TRR to Production Ratio of greater than 30 in 2001 to less than 10 years as production has grown from a low of 1.5 Bcf/d to a high of 4.3 Bcf/d. Despite this, the opening of a new exploration basin in the Deepwater has resulted in greater than 100% technically recoverable resource replacement in the last three years for natural gas and a 770% increase in Prospective Resources for crude oil. The data from these successful audits have served to demonstrate the astute management by the Government and People of Trinidad and Tobago of the country's hydrocarbon resources.","PeriodicalId":11142,"journal":{"name":"Day 3 Wed, June 30, 2021","volume":"9 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"20 Years of Independent Oil and Gas Audits: The Trinidad and Tobago Story\",\"authors\":\"C. Welsh\",\"doi\":\"10.2118/200985-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Over the 20 year period from 2001 to 2020, the Ministry of Energy and Energy Industries (MEEI) of Trinidad and Tobago commissioned 19 gas and 3 oil audits conducted by independent consultants. Trinidad and Tobago's natural gas Technically Recoverable Resources (TRR) moved from a P1+C1 TRR to Production Ratio of greater than 30 in 2001 to less than 10 years as production has grown from a low of 1.5 Bcf/d to a high of 4.3 Bcf/d. Despite this, the opening of a new exploration basin in the Deepwater has resulted in greater than 100% technically recoverable resource replacement in the last three years for natural gas and a 770% increase in Prospective Resources for crude oil. The data from these successful audits have served to demonstrate the astute management by the Government and People of Trinidad and Tobago of the country's hydrocarbon resources.\",\"PeriodicalId\":11142,\"journal\":{\"name\":\"Day 3 Wed, June 30, 2021\",\"volume\":\"9 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, June 30, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/200985-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, June 30, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/200985-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在2001年至2020年的20年间,特立尼达和多巴哥能源和能源工业部(MEEI)委托独立顾问进行了19次天然气和3次石油审计。随着产量从15亿立方英尺/天的低点增长到43亿立方英尺/天的高点,特立尼达和多巴哥的天然气技术可采资源(TRR)从2001年的P1+C1 TRR与产量之比超过30,发展到不到10年。尽管如此,在过去的三年中,深水新勘探盆地的开放使天然气的技术可采资源替代率超过100%,原油的预期资源增加了770%。这些成功审计的数据证明了特立尼达和多巴哥政府和人民对该国碳氢化合物资源的精明管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
20 Years of Independent Oil and Gas Audits: The Trinidad and Tobago Story
Over the 20 year period from 2001 to 2020, the Ministry of Energy and Energy Industries (MEEI) of Trinidad and Tobago commissioned 19 gas and 3 oil audits conducted by independent consultants. Trinidad and Tobago's natural gas Technically Recoverable Resources (TRR) moved from a P1+C1 TRR to Production Ratio of greater than 30 in 2001 to less than 10 years as production has grown from a low of 1.5 Bcf/d to a high of 4.3 Bcf/d. Despite this, the opening of a new exploration basin in the Deepwater has resulted in greater than 100% technically recoverable resource replacement in the last three years for natural gas and a 770% increase in Prospective Resources for crude oil. The data from these successful audits have served to demonstrate the astute management by the Government and People of Trinidad and Tobago of the country's hydrocarbon resources.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluating the Lower Cruse and Navet Formations Within the Wd-8 Lease Operatorship Block Experimental Separation Performance of In-Line Piggable Liquid Removal Unit – Pseudo Dry Gas Systems 20 Years of Independent Oil and Gas Audits: The Trinidad and Tobago Story An Intelligent Completion and Artificial Lift Technology to Develop Large Carbonate Reservoirs: Novel Completion and Zonal Water Injection via Remote Control Methods to Develop Horizontal Wells Development Features of Cold Production with Horizontal Wells in a Foamy Extra-Heavy Oil Reservoir
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1