地理分布维护任务的多任务调度

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2022-01-01 DOI:10.5267/j.ijiec.2021.7.001
Hamed Allaham, D. Dalalah
{"title":"地理分布维护任务的多任务调度","authors":"Hamed Allaham, D. Dalalah","doi":"10.5267/j.ijiec.2021.7.001","DOIUrl":null,"url":null,"abstract":"Due to its proactive impact on the serviceability of components in a system, preventive maintenance plays an important role particularly in systems of geographically spread infrastructure such as utilities networks in commercial buildings. What makes such systems differ from the classical schemes is the routing and technicians' travel times. Besides, maintenance in commercial buildings is characterized by its short tasks’ durations and spatial distribution within and between different buildings, a class of problems that has not been suitably investigated. Although it is not trivial to assign particular duties solely to multi-skilled teams under limited time and capacity constraints, the problem becomes more challenging when travel routes, durations and service levels are considered during the execution of the daily maintenance tasks. To address this problem, we propose a Mixed Integer Linear Programming Model that considers the above settings. The model exact solution recommends collaborative choices that include the number of maintenance teams, the selected tasks, routes, tasks schedules, all detailed to days and teams. The model will reduce the cost of labor, replacement parts, penalties on service levels and travel time. The optimization model has been tested using different maintenance scenarios taken from a real maintenance provider in the UAE. Using CPLEX solver, the findings demonstrate an inspiring time utilization, schedules of minimal routing and high service levels using a minimum number of teams. Different travel speeds of diverse assortment of tasks, durations and cost settings have been tested for further sensitivity analysis.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"26 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"MILP of multitask scheduling of geographically distributed maintenance tasks\",\"authors\":\"Hamed Allaham, D. Dalalah\",\"doi\":\"10.5267/j.ijiec.2021.7.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to its proactive impact on the serviceability of components in a system, preventive maintenance plays an important role particularly in systems of geographically spread infrastructure such as utilities networks in commercial buildings. What makes such systems differ from the classical schemes is the routing and technicians' travel times. Besides, maintenance in commercial buildings is characterized by its short tasks’ durations and spatial distribution within and between different buildings, a class of problems that has not been suitably investigated. Although it is not trivial to assign particular duties solely to multi-skilled teams under limited time and capacity constraints, the problem becomes more challenging when travel routes, durations and service levels are considered during the execution of the daily maintenance tasks. To address this problem, we propose a Mixed Integer Linear Programming Model that considers the above settings. The model exact solution recommends collaborative choices that include the number of maintenance teams, the selected tasks, routes, tasks schedules, all detailed to days and teams. The model will reduce the cost of labor, replacement parts, penalties on service levels and travel time. The optimization model has been tested using different maintenance scenarios taken from a real maintenance provider in the UAE. Using CPLEX solver, the findings demonstrate an inspiring time utilization, schedules of minimal routing and high service levels using a minimum number of teams. Different travel speeds of diverse assortment of tasks, durations and cost settings have been tested for further sensitivity analysis.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2021.7.001\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2021.7.001","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 7

摘要

由于预防性维护对系统中组件的可维护性具有积极的影响,因此预防性维护在地理分布的基础设施系统(如商业建筑中的公用事业网络)中发挥着重要作用。这种系统与传统方案的不同之处在于路线和技术人员的旅行时间。此外,商业建筑的维修任务持续时间短,在不同建筑内部和不同建筑之间的空间分布,这类问题还没有得到适当的研究。虽然在有限的时间和能力限制下,将特定的任务单独分配给多技能团队并非易事,但在执行日常维护任务时考虑到旅行路线、持续时间和服务水平,这个问题就变得更具挑战性。为了解决这个问题,我们提出了一个考虑上述设置的混合整数线性规划模型。模型精确的解决方案建议协作选择,包括维护团队的数量、选择的任务、路线、任务时间表,所有这些都详细到天数和团队。这种模式将降低人工成本、更换零件的成本、对服务水平的惩罚和旅行时间。该优化模型已经在阿联酋的实际维护提供商的不同维护场景中进行了测试。使用CPLEX求解器,结果显示了令人鼓舞的时间利用率,最少的路由计划和使用最少数量的团队的高服务水平。为了进一步的敏感性分析,我们测试了不同任务分类、持续时间和成本设置的不同旅行速度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
MILP of multitask scheduling of geographically distributed maintenance tasks
Due to its proactive impact on the serviceability of components in a system, preventive maintenance plays an important role particularly in systems of geographically spread infrastructure such as utilities networks in commercial buildings. What makes such systems differ from the classical schemes is the routing and technicians' travel times. Besides, maintenance in commercial buildings is characterized by its short tasks’ durations and spatial distribution within and between different buildings, a class of problems that has not been suitably investigated. Although it is not trivial to assign particular duties solely to multi-skilled teams under limited time and capacity constraints, the problem becomes more challenging when travel routes, durations and service levels are considered during the execution of the daily maintenance tasks. To address this problem, we propose a Mixed Integer Linear Programming Model that considers the above settings. The model exact solution recommends collaborative choices that include the number of maintenance teams, the selected tasks, routes, tasks schedules, all detailed to days and teams. The model will reduce the cost of labor, replacement parts, penalties on service levels and travel time. The optimization model has been tested using different maintenance scenarios taken from a real maintenance provider in the UAE. Using CPLEX solver, the findings demonstrate an inspiring time utilization, schedules of minimal routing and high service levels using a minimum number of teams. Different travel speeds of diverse assortment of tasks, durations and cost settings have been tested for further sensitivity analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1