EOR储量和资源评估的适应性方法,在一家石油和天然气公司注册并应用

Lilibeth Chiquinquira Perdomo, C. Alvarez, Maria Edith Gracia, Guillermo Danilo Salomone, Gilberto Ventuirini, Gustavo Adolfo Selva
{"title":"EOR储量和资源评估的适应性方法,在一家石油和天然气公司注册并应用","authors":"Lilibeth Chiquinquira Perdomo, C. Alvarez, Maria Edith Gracia, Guillermo Danilo Salomone, Gilberto Ventuirini, Gustavo Adolfo Selva","doi":"10.2118/205215-ms","DOIUrl":null,"url":null,"abstract":"\n As other companies registered in the US stock market, the company reports oil and gas reserves, in compliance with the definitions of the Securities and Exchange Commission (SEC). In addition, it complies internally with the guidelines established by the Petroleum Resources Management System to certify its resources.\n The PRMS focuses on supporting consistent evaluation of oil resources based on technically sound industry practices, providing fundamental principles for the assessment and classification of oil reserves and resources, but does not provide specific guidance for the classification and categorization of quantities associated with IOR projects.\n Recently, the company has implemented EOR pilot projects, and their results seem to show commerciality for future development or expansion to new areas, displaying multiple opportunities and proposals to incorporate reserves and resources.\n So far, the pilot projects and their expansions have been addressed only from the point of view of incremental projects, as an improvement over the previous secondary recovery.\n The company does not have sufficient track record in booking reserves or resources from EOR projects, their quantities have been incorporated following bibliographic references and results of EOR projects with proven commerciality around the world.\n For this reason, the need arose to have a tool that provides the company with methodological criteria to evaluate the resources and reserves inherent in this type of project, that incorporate the \"best practices\" of the industry and that respect the guidelines and definitions of PRMS for incremental projects.\n That was how, the need to meet this challenging goal led company to develop its \"EOR Resources and Reserves Assessment Guide\" with the advice of a renowned consulting company.\n Although the Guide is not intended to be a review of the large body of existing IOR literature, it contains several useful references that serve as a starting point for understanding the IOR project for assessment process of resources and reserves.\n This document shows the process of development and implementation of the EOR guide, complementing the existing guides within the corporation and providing the company with a positive result within the internal processes of Audit, reserves and resources for this type of projects.","PeriodicalId":10904,"journal":{"name":"Day 2 Tue, October 19, 2021","volume":"495 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Adapted Methodology for Evaluating EOR Reserves and Resources, Incorporated and Applied at an Oil and Gas Company\",\"authors\":\"Lilibeth Chiquinquira Perdomo, C. Alvarez, Maria Edith Gracia, Guillermo Danilo Salomone, Gilberto Ventuirini, Gustavo Adolfo Selva\",\"doi\":\"10.2118/205215-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n As other companies registered in the US stock market, the company reports oil and gas reserves, in compliance with the definitions of the Securities and Exchange Commission (SEC). In addition, it complies internally with the guidelines established by the Petroleum Resources Management System to certify its resources.\\n The PRMS focuses on supporting consistent evaluation of oil resources based on technically sound industry practices, providing fundamental principles for the assessment and classification of oil reserves and resources, but does not provide specific guidance for the classification and categorization of quantities associated with IOR projects.\\n Recently, the company has implemented EOR pilot projects, and their results seem to show commerciality for future development or expansion to new areas, displaying multiple opportunities and proposals to incorporate reserves and resources.\\n So far, the pilot projects and their expansions have been addressed only from the point of view of incremental projects, as an improvement over the previous secondary recovery.\\n The company does not have sufficient track record in booking reserves or resources from EOR projects, their quantities have been incorporated following bibliographic references and results of EOR projects with proven commerciality around the world.\\n For this reason, the need arose to have a tool that provides the company with methodological criteria to evaluate the resources and reserves inherent in this type of project, that incorporate the \\\"best practices\\\" of the industry and that respect the guidelines and definitions of PRMS for incremental projects.\\n That was how, the need to meet this challenging goal led company to develop its \\\"EOR Resources and Reserves Assessment Guide\\\" with the advice of a renowned consulting company.\\n Although the Guide is not intended to be a review of the large body of existing IOR literature, it contains several useful references that serve as a starting point for understanding the IOR project for assessment process of resources and reserves.\\n This document shows the process of development and implementation of the EOR guide, complementing the existing guides within the corporation and providing the company with a positive result within the internal processes of Audit, reserves and resources for this type of projects.\",\"PeriodicalId\":10904,\"journal\":{\"name\":\"Day 2 Tue, October 19, 2021\",\"volume\":\"495 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 19, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205215-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 19, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205215-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

与其他在美国股票市场注册的公司一样,该公司报告的石油和天然气储量符合美国证券交易委员会(SEC)的定义。此外,它在内部遵守石油资源管理系统制定的指导方针,以证明其资源。PRMS的重点是支持根据技术上合理的工业实践对石油资源进行一致的评价,为石油储量和资源的评价和分类提供基本原则,但没有为与IOR项目有关的数量分类和分类提供具体指导。最近,该公司已经实施了EOR试点项目,其结果似乎显示出未来开发或扩展到新区域的商业价值,展示了多种机会和整合储量和资源的建议。到目前为止,试点项目及其扩展只是从增量项目的角度来处理,作为对以前的二次采收的改进。该公司在EOR项目中没有足够的储量或资源记录,其数量是根据参考文献和世界各地经证实具有商业价值的EOR项目的结果合并的。出于这个原因,需要有一种工具,为公司提供方法标准来评估这种类型项目中固有的资源和储量,结合行业的“最佳实践”,并尊重增量项目的PRMS的指导方针和定义。因此,为了实现这一具有挑战性的目标,该公司在一家知名咨询公司的建议下制定了“EOR资源和储量评估指南”。虽然本指南无意对现有的大量IOR文献进行审查,但它包含了一些有用的参考资料,可作为了解IOR项目评估资源和储量过程的起点。本文件展示了EOR指南的开发和实施过程,补充了公司内部现有的指南,并为公司提供了这类项目内部审计、储量和资源的积极结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Adapted Methodology for Evaluating EOR Reserves and Resources, Incorporated and Applied at an Oil and Gas Company
As other companies registered in the US stock market, the company reports oil and gas reserves, in compliance with the definitions of the Securities and Exchange Commission (SEC). In addition, it complies internally with the guidelines established by the Petroleum Resources Management System to certify its resources. The PRMS focuses on supporting consistent evaluation of oil resources based on technically sound industry practices, providing fundamental principles for the assessment and classification of oil reserves and resources, but does not provide specific guidance for the classification and categorization of quantities associated with IOR projects. Recently, the company has implemented EOR pilot projects, and their results seem to show commerciality for future development or expansion to new areas, displaying multiple opportunities and proposals to incorporate reserves and resources. So far, the pilot projects and their expansions have been addressed only from the point of view of incremental projects, as an improvement over the previous secondary recovery. The company does not have sufficient track record in booking reserves or resources from EOR projects, their quantities have been incorporated following bibliographic references and results of EOR projects with proven commerciality around the world. For this reason, the need arose to have a tool that provides the company with methodological criteria to evaluate the resources and reserves inherent in this type of project, that incorporate the "best practices" of the industry and that respect the guidelines and definitions of PRMS for incremental projects. That was how, the need to meet this challenging goal led company to develop its "EOR Resources and Reserves Assessment Guide" with the advice of a renowned consulting company. Although the Guide is not intended to be a review of the large body of existing IOR literature, it contains several useful references that serve as a starting point for understanding the IOR project for assessment process of resources and reserves. This document shows the process of development and implementation of the EOR guide, complementing the existing guides within the corporation and providing the company with a positive result within the internal processes of Audit, reserves and resources for this type of projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Control of malodorous gases emission from wet-end white water with hydrogen peroxide Application of spruce wood flour as a cellulosic-based wood additive for recycled paper applications— A pilot paper machine study Corrosion damage and in-service inspection of retractable sootblower lances in recovery boilers Kraft recovery boiler operation with splash plate and/or beer can nozzles — a case study Application of Machine Learning in Gas-Hydrate Formation and Trendline Prediction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1