{"title":"纽约制造","authors":"Lina Zeldovich","doi":"10.1115/1.2022-mar3","DOIUrl":null,"url":null,"abstract":"\n The eight digester towers at New York City's Newtown Creek Wastewater Treatment Plant seamlessly convert sewage into biogas and a dirt-like output, similar to how Mother Nature would do it. At 145 feet high and 80 feet in diameter, each egg holds about 3 million gallons of sludge, converting it into 2 million cubic feet of gas every day.","PeriodicalId":18406,"journal":{"name":"Mechanical Engineering","volume":"5 1","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2022-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Made in New York\",\"authors\":\"Lina Zeldovich\",\"doi\":\"10.1115/1.2022-mar3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The eight digester towers at New York City's Newtown Creek Wastewater Treatment Plant seamlessly convert sewage into biogas and a dirt-like output, similar to how Mother Nature would do it. At 145 feet high and 80 feet in diameter, each egg holds about 3 million gallons of sludge, converting it into 2 million cubic feet of gas every day.\",\"PeriodicalId\":18406,\"journal\":{\"name\":\"Mechanical Engineering\",\"volume\":\"5 1\",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2022-02-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mechanical Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1115/1.2022-mar3\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MECHANICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mechanical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1115/1.2022-mar3","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MECHANICAL","Score":null,"Total":0}
The eight digester towers at New York City's Newtown Creek Wastewater Treatment Plant seamlessly convert sewage into biogas and a dirt-like output, similar to how Mother Nature would do it. At 145 feet high and 80 feet in diameter, each egg holds about 3 million gallons of sludge, converting it into 2 million cubic feet of gas every day.