基于RFMEA和贝叶斯网络的建设项目进度风险分析:以加州-哥伦比亚项目为例

C. A. Mican, V. Jimenez, J. Perez, J. Borrero
{"title":"基于RFMEA和贝叶斯网络的建设项目进度风险分析:以加州-哥伦比亚项目为例","authors":"C. A. Mican, V. Jimenez, J. Perez, J. Borrero","doi":"10.1109/IEEM.2013.6962445","DOIUrl":null,"url":null,"abstract":"The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"36 1","pages":"415-419"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study\",\"authors\":\"C. A. Mican, V. Jimenez, J. Perez, J. Borrero\",\"doi\":\"10.1109/IEEM.2013.6962445\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"36 1\",\"pages\":\"415-419\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962445\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962445","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

由于不确定性和风险,建筑行业的项目是在复杂和动态的环境中开发的。进度风险是指项目超出初始规划的可能性,为此提出了几种方法;另一方面,经济处于发展阶段的国家很少使用这些工具。本文以加州-哥伦比亚市建筑行业为例,将RMFEA优先排序方法与贝叶斯网络模型相结合,进行建筑项目进度风险分析。识别这类项目的主要风险以及它们对按时完成项目的可能性的影响是可能的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study
The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Extension of the PROMETHEE Method to the Multicriteria Dual Clustering Problem On the Necessity for Improving Effectiveness of Qualification Process for Spare Parts Additive Manufacturing in a Circular Economy Supply Chain Selecting Temporary Flood Shelter Locations by P-Center Model A Feasible Schema Design Strategy for Amazon DynamoDB: A Nested Normal Form Approach Flood Shelters Location Using P-median Model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1