{"title":"在弱馈线上,嵌入式发电机与配电网互连导致电压上升","authors":"Saad Mekhilef, T. R. Chard, V. Ramachandramurthy","doi":"10.1109/ISIEA.2009.5356314","DOIUrl":null,"url":null,"abstract":"This paper presents voltage rise due to inter-connection of embedded generators to distribution network on weak feeder. Studies were performed on Malaysia's 11kV network using a simulation tool called PSS ADEPTTM. Various scenarios were investigated such as EG penetration level, location of EG plant, sizing of feeder (distance from MAIN substation), loading of network, Automatic Voltage Control relay set point at MAIN substation, power factor of network and various operating mode of EG. It is concluded that the introduction of EG at the distribution network will cause voltage rise and this leads to customer voltages being out of the allowable range. Through careful design of the connection arrangement, Distribution Network Operator (DNO) can ensure that the new EG connection does not cause problems and at the same time, enhance the performance of the network.","PeriodicalId":6447,"journal":{"name":"2009 IEEE Symposium on Industrial Electronics & Applications","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Voltage rise due to inter-connection of embedded generators to distribution network on weak feeder\",\"authors\":\"Saad Mekhilef, T. R. Chard, V. Ramachandramurthy\",\"doi\":\"10.1109/ISIEA.2009.5356314\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents voltage rise due to inter-connection of embedded generators to distribution network on weak feeder. Studies were performed on Malaysia's 11kV network using a simulation tool called PSS ADEPTTM. Various scenarios were investigated such as EG penetration level, location of EG plant, sizing of feeder (distance from MAIN substation), loading of network, Automatic Voltage Control relay set point at MAIN substation, power factor of network and various operating mode of EG. It is concluded that the introduction of EG at the distribution network will cause voltage rise and this leads to customer voltages being out of the allowable range. Through careful design of the connection arrangement, Distribution Network Operator (DNO) can ensure that the new EG connection does not cause problems and at the same time, enhance the performance of the network.\",\"PeriodicalId\":6447,\"journal\":{\"name\":\"2009 IEEE Symposium on Industrial Electronics & Applications\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE Symposium on Industrial Electronics & Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISIEA.2009.5356314\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Symposium on Industrial Electronics & Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIEA.2009.5356314","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文介绍了嵌入式发电机在弱馈线上与配电网互连时产生的电压上升问题。研究使用了一种名为PSS ADEPTTM的模拟工具在马来西亚的11kV网络上进行。研究了EG的渗透水平、EG厂位置、馈线尺寸(与主变电站的距离)、电网负荷、主变电站电压自动控制继电器设定点、电网功率因数和EG的各种运行模式等各种场景。结果表明,在配电网中引入EG会引起电压上升,从而导致用户电压超出允许范围。配电网运营商(DNO)通过对接线布置的精心设计,可以保证新的EG接线不会产生问题,同时提高电网的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Voltage rise due to inter-connection of embedded generators to distribution network on weak feeder
This paper presents voltage rise due to inter-connection of embedded generators to distribution network on weak feeder. Studies were performed on Malaysia's 11kV network using a simulation tool called PSS ADEPTTM. Various scenarios were investigated such as EG penetration level, location of EG plant, sizing of feeder (distance from MAIN substation), loading of network, Automatic Voltage Control relay set point at MAIN substation, power factor of network and various operating mode of EG. It is concluded that the introduction of EG at the distribution network will cause voltage rise and this leads to customer voltages being out of the allowable range. Through careful design of the connection arrangement, Distribution Network Operator (DNO) can ensure that the new EG connection does not cause problems and at the same time, enhance the performance of the network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Genetic Algorithm optimization of I/O scales and parameters for FLIC in servomotor control Application and evaluation of high power Zigbee based wireless sensor network in water irrigation control monitoring system Efficiency performance analysis of Series Loaded Resonant converter Parallel distributed compensation based robust fuzzy control A new Shifted Scaled LS channel estimator for Rician flat fading MIMO channel
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1