{"title":"苏丹红海州GebeitAlsharaf大坝的发电潜力","authors":"M. Abdelgadir","doi":"10.19080/AIBM.2018.11.555809","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.","PeriodicalId":7446,"journal":{"name":"Advances in Biotechnology & Microbiology","volume":"70 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Potentiality of Power Production from GebeitAlsharaf Dam, Red Sea State, Sudan\",\"authors\":\"M. Abdelgadir\",\"doi\":\"10.19080/AIBM.2018.11.555809\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.\",\"PeriodicalId\":7446,\"journal\":{\"name\":\"Advances in Biotechnology & Microbiology\",\"volume\":\"70 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Biotechnology & Microbiology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19080/AIBM.2018.11.555809\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Biotechnology & Microbiology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19080/AIBM.2018.11.555809","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
本研究的目的是研究利用水力驱动安装在大坝饮用水管道中的水轮机的可能性。万花筒大坝是由大坝实施单位在红海州建造的,通过收集和储存雨水来解决供水问题。在这项研究中,所需的数据是从大坝现场收集的,并在水文和地形研究方面进行了分析。利用这些数据,利用Excel程序分析,应用能量方程估算了管道的流量。给定流量和可用扬程,计算得到功率约为19.39 kW。选择合适的水轮机和发电机。最后,将结果与使用程序(Hydro Help - CLOVA issue, 2010年1月)时获得的结果进行比较,发现两者非常接近。
Potentiality of Power Production from GebeitAlsharaf Dam, Red Sea State, Sudan
The purpose of this research is to study the possibility of using water power to drive a hydraulic turbine installed in the drinking water pipeline emerging from a dam. The dam is constructed in the Red Sea state by the Dams Implementation Unit Kaleidoscope to solve water supply problem by harvesting and storing rainwater. In this study the required data is collected from the site of the dam and analyzed in terms of hydrological and topographic studies. Using this data, the flow rate of water through the pipe is estimated by applying the energy equation using Excel program analysis. Given flow rate and available head, the power is calculated and found to be about 19.39 kW. Suitable turbine and generator are selected. Finally, the results are compared with those obtained when using the program (Hydro Help - CLOVA issue, January 2010) and found to give very close agreements.