Pekanbaru镇u型弯道的路演分析

Husni Husni, Doni Rinaldi Basri, Delka Octiriani
{"title":"Pekanbaru镇u型弯道的路演分析","authors":"Husni Husni, Doni Rinaldi Basri, Delka Octiriani","doi":"10.35334/cesj.v2i1.3324","DOIUrl":null,"url":null,"abstract":"ABSTRACT: As a result of the closure of the U-Turn, the people around Jalan HR. Soebrantas complained because the travel time they took was very long and there was a buildup of vehicles at the U-Turn intersection of Jalan Manggis. The problem in this study is how is the condition of the U-Turn in front of the handsome Nurul Huda Mosque today . and how to overcome the U-Turn delay in front of the Nurul Huda Mosque . The method used in this study is analysis of existing traffic performance, analysis of traffic performance, applying 3 alternatives , proposing alternative problem solving, alternative problem solving based on the results of HR Road Performance Comparison. Soebrantas, it is obtained that the average degree of road saturation is 0.80, and the service level is D: The flow is approaching unstable, the speed is still tolerable. Alternative 2, the solution to the problem for this research, namely by widening the road in front of the shops This plan affects traffic performance to run smoothly as happened on the Purwodadi road section, but this is still hampered due to land acquisition if it is carried out along the HR road. Soebrantas. Alternative 3, using vissim simulation for U-Turn closure This plan is the final plan, but if this plan is carried out, you must plan for a Fly Over at the Tobek Godang red light intersectionKeywords: Alternative , U-Turn, Road performance","PeriodicalId":30755,"journal":{"name":"Selected Scientific Papers Journal of Civil Engineering","volume":"21 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Kinerja Ruas Jalan Terhadap U-Turn di Kota Pekanbaru\",\"authors\":\"Husni Husni, Doni Rinaldi Basri, Delka Octiriani\",\"doi\":\"10.35334/cesj.v2i1.3324\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT: As a result of the closure of the U-Turn, the people around Jalan HR. Soebrantas complained because the travel time they took was very long and there was a buildup of vehicles at the U-Turn intersection of Jalan Manggis. The problem in this study is how is the condition of the U-Turn in front of the handsome Nurul Huda Mosque today . and how to overcome the U-Turn delay in front of the Nurul Huda Mosque . The method used in this study is analysis of existing traffic performance, analysis of traffic performance, applying 3 alternatives , proposing alternative problem solving, alternative problem solving based on the results of HR Road Performance Comparison. Soebrantas, it is obtained that the average degree of road saturation is 0.80, and the service level is D: The flow is approaching unstable, the speed is still tolerable. Alternative 2, the solution to the problem for this research, namely by widening the road in front of the shops This plan affects traffic performance to run smoothly as happened on the Purwodadi road section, but this is still hampered due to land acquisition if it is carried out along the HR road. Soebrantas. Alternative 3, using vissim simulation for U-Turn closure This plan is the final plan, but if this plan is carried out, you must plan for a Fly Over at the Tobek Godang red light intersectionKeywords: Alternative , U-Turn, Road performance\",\"PeriodicalId\":30755,\"journal\":{\"name\":\"Selected Scientific Papers Journal of Civil Engineering\",\"volume\":\"21 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Selected Scientific Papers Journal of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35334/cesj.v2i1.3324\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Selected Scientific Papers Journal of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35334/cesj.v2i1.3324","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:由于“u型掉头”的关闭,嘉兰人力资源部周围的人们纷纷开始关注。Soebrantas抱怨说,因为他们的旅行时间很长,而且在Jalan Manggis的u形路口堆积了大量车辆。本研究的问题是,在美丽的努鲁胡达清真寺前的u型弯道今天的状况如何。以及如何克服Nurul Huda清真寺前的u型转弯延误。本研究采用的方法是:分析现有交通绩效、分析交通绩效、应用3种替代方案、提出替代问题解决方案、基于HR道路绩效比较结果的替代问题解决方案。得到路面饱和平均程度为0.80,服务水平为D:流量接近不稳定,速度仍可容忍。替代方案2,本研究问题的解决方案,即通过拓宽商店前面的道路。该计划影响交通性能,如在Purwodadi路段上发生的那样顺利运行,但如果沿着HR道路进行,由于土地征用,这仍然受到阻碍。Soebrantas。这个方案是最终方案,但如果执行这个方案,你必须在Tobek Godang红灯路口规划一个飞越。关键词:备选方案,u型转弯,道路性能
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis Kinerja Ruas Jalan Terhadap U-Turn di Kota Pekanbaru
ABSTRACT: As a result of the closure of the U-Turn, the people around Jalan HR. Soebrantas complained because the travel time they took was very long and there was a buildup of vehicles at the U-Turn intersection of Jalan Manggis. The problem in this study is how is the condition of the U-Turn in front of the handsome Nurul Huda Mosque today . and how to overcome the U-Turn delay in front of the Nurul Huda Mosque . The method used in this study is analysis of existing traffic performance, analysis of traffic performance, applying 3 alternatives , proposing alternative problem solving, alternative problem solving based on the results of HR Road Performance Comparison. Soebrantas, it is obtained that the average degree of road saturation is 0.80, and the service level is D: The flow is approaching unstable, the speed is still tolerable. Alternative 2, the solution to the problem for this research, namely by widening the road in front of the shops This plan affects traffic performance to run smoothly as happened on the Purwodadi road section, but this is still hampered due to land acquisition if it is carried out along the HR road. Soebrantas. Alternative 3, using vissim simulation for U-Turn closure This plan is the final plan, but if this plan is carried out, you must plan for a Fly Over at the Tobek Godang red light intersectionKeywords: Alternative , U-Turn, Road performance
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
27 weeks
期刊最新文献
Fly Ash PLTU Sumber Alam Sekurau Kalimantan Utara sebagai Binder Beton Geopolimer Analisis Kinerja Ruas Jalan Terhadap U-Turn di Kota Pekanbaru PASIR LAUT KOTA TARAKAN SEBAGAI BAHAN STABILISASI TANAH LUNAK EVALUASI KINERJA TERMINAL PENUMPANG ANGKUTAN LAUT DI PELABUHAN TENGKAYU I KOTA TARAKAN KOMPARASI BAJA KONVENSIONAL DAN BAJA KOMPOSIT SANDWICH PANEL SEBAGAI MATERIAL PELAT LANTAI JEMBATAN PENYEBERANGAN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1