{"title":"辅助供电系统的更换——以某城市轨道交通为例","authors":"S.M.L. Mak,&nbsp;D. Sculli","doi":"10.1016/0167-188X(91)90013-R","DOIUrl":null,"url":null,"abstract":"<div><p>This paper reports the results of a study into the economic replacement of the auxiliary power supply units that are installed in every two-car unit making up passenger trains. The core of the study is the determination of when the existing power supply units should be replaced by more technically advanced units. Conventional theory is used to determine the resulting internal rate of return for replacement at different points in time. The paper also discusses the many subjective factors involved and the assumptions that will need to be made in order to solve large replacement problems of this kind.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1991-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90013-R","citationCount":"0","resultStr":"{\"title\":\"Replacement of auxiliary power supply system—A case study in an urban railway\",\"authors\":\"S.M.L. Mak,&nbsp;D. Sculli\",\"doi\":\"10.1016/0167-188X(91)90013-R\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper reports the results of a study into the economic replacement of the auxiliary power supply units that are installed in every two-car unit making up passenger trains. The core of the study is the determination of when the existing power supply units should be replaced by more technically advanced units. Conventional theory is used to determine the resulting internal rate of return for replacement at different points in time. The paper also discusses the many subjective factors involved and the assumptions that will need to be made in order to solve large replacement problems of this kind.</p></div>\",\"PeriodicalId\":100476,\"journal\":{\"name\":\"Engineering Costs and Production Economics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-188X(91)90013-R\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Costs and Production Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167188X9190013R\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190013R","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文报告了一项研究的结果,以经济替代辅助电源装置安装在每两节车厢组成的旅客列车。研究的核心是确定什么时候应该用技术更先进的装置取代现有的供电装置。传统的理论是用来确定在不同时间点的替换的内部收益率。本文还讨论了许多涉及的主观因素,以及为了解决这类大规模更换问题需要做出的假设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Replacement of auxiliary power supply system—A case study in an urban railway

This paper reports the results of a study into the economic replacement of the auxiliary power supply units that are installed in every two-car unit making up passenger trains. The core of the study is the determination of when the existing power supply units should be replaced by more technically advanced units. Conventional theory is used to determine the resulting internal rate of return for replacement at different points in time. The paper also discusses the many subjective factors involved and the assumptions that will need to be made in order to solve large replacement problems of this kind.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Bicriterion jobshop scheduling with total flowtime and sum of squared lateness Investment justification in flexible manufacturing systems Using multiple time-series analysis, of assembly-line production of automobile engines — a case study Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1