基于改进模糊证据推理模型的水电工程总承包项目风险评价研究

Q. Li, Ying Guo, Bo Wang, Yingqi Chen, Jiaxiao Xie, Chuanhao Wen
{"title":"基于改进模糊证据推理模型的水电工程总承包项目风险评价研究","authors":"Q. Li, Ying Guo, Bo Wang, Yingqi Chen, Jiaxiao Xie, Chuanhao Wen","doi":"10.3390/systems11070327","DOIUrl":null,"url":null,"abstract":"As clean renewable energy with strong advantages, hydropower plays an extremely important role in promoting green development and energy allocation patterns. Hydropower project construction is characterized by long duration, large scale, high cost, many participants, and complex construction conditions, and is closely related to the economy, society, and ecological environment, and its construction management mode and construction risk management have become the focus of extensive attention from all walks of life. In this paper, the risk evaluation index system of hydropower engineering EPC project is constructed, and the linear weighted combination method is introduced to determine the comprehensive weights based on the calculation of weights by sequential relationship method and entropy weight method, and the improved fuzzy normal distribution is introduced as the subordinate function distribution of fuzzy evaluation level based on DS evidence theory and fuzzy theory. The risk evaluation model of a hydropower engineering EPC project is also established. Meanwhile, the model was analyzed with hydropower project examples to verify the accuracy and practicality of the model, which can guide hydropower project stakeholders to manage hydropower project risks comprehensively, collaboratively, and efficiently, and provide decision support for hydropower project construction risk management.","PeriodicalId":52858,"journal":{"name":"syst mt`lyh","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Research on Risk Evaluation of Hydropower Engineering EPC Project Based on Improved Fuzzy Evidence Reasoning Model\",\"authors\":\"Q. Li, Ying Guo, Bo Wang, Yingqi Chen, Jiaxiao Xie, Chuanhao Wen\",\"doi\":\"10.3390/systems11070327\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As clean renewable energy with strong advantages, hydropower plays an extremely important role in promoting green development and energy allocation patterns. Hydropower project construction is characterized by long duration, large scale, high cost, many participants, and complex construction conditions, and is closely related to the economy, society, and ecological environment, and its construction management mode and construction risk management have become the focus of extensive attention from all walks of life. In this paper, the risk evaluation index system of hydropower engineering EPC project is constructed, and the linear weighted combination method is introduced to determine the comprehensive weights based on the calculation of weights by sequential relationship method and entropy weight method, and the improved fuzzy normal distribution is introduced as the subordinate function distribution of fuzzy evaluation level based on DS evidence theory and fuzzy theory. The risk evaluation model of a hydropower engineering EPC project is also established. Meanwhile, the model was analyzed with hydropower project examples to verify the accuracy and practicality of the model, which can guide hydropower project stakeholders to manage hydropower project risks comprehensively, collaboratively, and efficiently, and provide decision support for hydropower project construction risk management.\",\"PeriodicalId\":52858,\"journal\":{\"name\":\"syst mt`lyh\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"syst mt`lyh\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/systems11070327\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"syst mt`lyh","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/systems11070327","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

水电作为具有强大优势的清洁可再生能源,在推动绿色发展和能源配置模式方面发挥着极其重要的作用。水电工程建设具有工期长、规模大、成本高、参与主体多、建设条件复杂,与经济、社会、生态环境密切相关的特点,其建设管理模式和建设风险管理已成为社会各界广泛关注的焦点。本文构建了水电工程EPC项目风险评价指标体系,在顺序关系法和熵权法计算权重的基础上,引入线性加权组合法确定综合权重,并基于DS证据理论和模糊理论,引入改进的模糊正态分布作为模糊评价等级的隶属函数分布。建立了某水电工程EPC项目风险评价模型。同时,通过水电工程实例对模型进行了分析,验证了模型的准确性和实用性,可以指导水电工程利益相关者全面、协同、高效地管理水电工程风险,为水电工程建设风险管理提供决策支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Research on Risk Evaluation of Hydropower Engineering EPC Project Based on Improved Fuzzy Evidence Reasoning Model
As clean renewable energy with strong advantages, hydropower plays an extremely important role in promoting green development and energy allocation patterns. Hydropower project construction is characterized by long duration, large scale, high cost, many participants, and complex construction conditions, and is closely related to the economy, society, and ecological environment, and its construction management mode and construction risk management have become the focus of extensive attention from all walks of life. In this paper, the risk evaluation index system of hydropower engineering EPC project is constructed, and the linear weighted combination method is introduced to determine the comprehensive weights based on the calculation of weights by sequential relationship method and entropy weight method, and the improved fuzzy normal distribution is introduced as the subordinate function distribution of fuzzy evaluation level based on DS evidence theory and fuzzy theory. The risk evaluation model of a hydropower engineering EPC project is also established. Meanwhile, the model was analyzed with hydropower project examples to verify the accuracy and practicality of the model, which can guide hydropower project stakeholders to manage hydropower project risks comprehensively, collaboratively, and efficiently, and provide decision support for hydropower project construction risk management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
9 weeks
期刊最新文献
Optimal Government Subsidy Decision and Its Impact on Sustainable Development of a Closed-Loop Supply Chain An Emotional Design Model for Future Smart Product Based on Grounded Theory Evolution Mechanism of Public-Private Partnership Project Trust from the Perspective of the Supply Chain Derivation of Optimal Operation Factors of Anaerobic Digesters through Artificial Neural Network Technology An Industrial Case Study on the Monitoring and Maintenance Service System for a Robot-Driven Polishing Service System under Industry 4.0 Contexts
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1