G. Gantenbein, H. Braune, G. Dammertz, V. Erckmann, S. Illy, S. Kern, W. Kasparek, C. Lechte, W. Leonhardt, C. Liévin, G. Michel, F. Noke, F. Purps, A. Samartsev, A. Schlaich, M. Schmid, M. Thumm
{"title":"用于W7-X的1mw、140ghz系列回旋管的现状","authors":"G. Gantenbein, H. Braune, G. Dammertz, V. Erckmann, S. Illy, S. Kern, W. Kasparek, C. Lechte, W. Leonhardt, C. Liévin, G. Michel, F. Noke, F. Purps, A. Samartsev, A. Schlaich, M. Schmid, M. Thumm","doi":"10.1109/IRMMW-THZ.2011.6105186","DOIUrl":null,"url":null,"abstract":"A 10 MW, 140 GHz ECRH system with a pulse duration of 30 minutes is currently under construction for the stellarator W7-X at Greifswald. The RF power will be provided by 10 gyrotrons. A European collaboration has been established to develop and build 9 (out of 10) tubes each with an output power of 1 MW for continuous wave (CW) operation. This contribution reports on recent progress with the series gyrotrons.","PeriodicalId":6353,"journal":{"name":"2011 International Conference on Infrared, Millimeter, and Terahertz Waves","volume":"35 1","pages":"1-2"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Status of 1 MW, 140 GHz series gyrotrons for W7-X\",\"authors\":\"G. Gantenbein, H. Braune, G. Dammertz, V. Erckmann, S. Illy, S. Kern, W. Kasparek, C. Lechte, W. Leonhardt, C. Liévin, G. Michel, F. Noke, F. Purps, A. Samartsev, A. Schlaich, M. Schmid, M. Thumm\",\"doi\":\"10.1109/IRMMW-THZ.2011.6105186\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 10 MW, 140 GHz ECRH system with a pulse duration of 30 minutes is currently under construction for the stellarator W7-X at Greifswald. The RF power will be provided by 10 gyrotrons. A European collaboration has been established to develop and build 9 (out of 10) tubes each with an output power of 1 MW for continuous wave (CW) operation. This contribution reports on recent progress with the series gyrotrons.\",\"PeriodicalId\":6353,\"journal\":{\"name\":\"2011 International Conference on Infrared, Millimeter, and Terahertz Waves\",\"volume\":\"35 1\",\"pages\":\"1-2\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Infrared, Millimeter, and Terahertz Waves\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IRMMW-THZ.2011.6105186\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Infrared, Millimeter, and Terahertz Waves","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRMMW-THZ.2011.6105186","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A 10 MW, 140 GHz ECRH system with a pulse duration of 30 minutes is currently under construction for the stellarator W7-X at Greifswald. The RF power will be provided by 10 gyrotrons. A European collaboration has been established to develop and build 9 (out of 10) tubes each with an output power of 1 MW for continuous wave (CW) operation. This contribution reports on recent progress with the series gyrotrons.