在具有不确定和有限加工时间的双机流程车间中最小化总延迟

Muberra Allahverdi
{"title":"在具有不确定和有限加工时间的双机流程车间中最小化总延迟","authors":"Muberra Allahverdi","doi":"10.1051/ro/2023023","DOIUrl":null,"url":null,"abstract":"The two-machine flowshop scheduling problem with the performance measure of total tardiness is addressed. This performance measure is essential since meeting deadlines is a crucial part of scheduling and a major concern for some manufacturing systems. The processing times on both machines are uncertain variables and within some lower and upper bounds. This is due to uncertainty being an integral part of some manufacturing settings, making it impossible to predict processing times in advance. To the best of the author’s knowledge, this problem is addressed for the first time in this paper. A dominance relation is established and nineteen algorithms, which incorporate the established dominance relation, are presented. These algorithms are extensively evaluated through randomly generated data for different numbers of jobs and four different distributions, representing both symmetric and non-symmetric distributions. Computational experiments show that the presented algorithms perform extremely well when compared with a random solution. In particular, the best of the considered 19 algorithms reduces the error of the random solution by 99.99% and the error of the worst algorithm (among the 19 algorithms) by 99.96%. The results are confirmed by a test of hypothesis and this algorithm is recommended.","PeriodicalId":20872,"journal":{"name":"RAIRO Oper. Res.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Minimizing total tardiness in a two-machine flowshop with uncertain and bounded processing times\",\"authors\":\"Muberra Allahverdi\",\"doi\":\"10.1051/ro/2023023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The two-machine flowshop scheduling problem with the performance measure of total tardiness is addressed. This performance measure is essential since meeting deadlines is a crucial part of scheduling and a major concern for some manufacturing systems. The processing times on both machines are uncertain variables and within some lower and upper bounds. This is due to uncertainty being an integral part of some manufacturing settings, making it impossible to predict processing times in advance. To the best of the author’s knowledge, this problem is addressed for the first time in this paper. A dominance relation is established and nineteen algorithms, which incorporate the established dominance relation, are presented. These algorithms are extensively evaluated through randomly generated data for different numbers of jobs and four different distributions, representing both symmetric and non-symmetric distributions. Computational experiments show that the presented algorithms perform extremely well when compared with a random solution. In particular, the best of the considered 19 algorithms reduces the error of the random solution by 99.99% and the error of the worst algorithm (among the 19 algorithms) by 99.96%. The results are confirmed by a test of hypothesis and this algorithm is recommended.\",\"PeriodicalId\":20872,\"journal\":{\"name\":\"RAIRO Oper. Res.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"RAIRO Oper. Res.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1051/ro/2023023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"RAIRO Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1051/ro/2023023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

研究了以总延迟为性能指标的双机流水车间调度问题。这种性能度量是必要的,因为满足最后期限是调度的关键部分,也是一些制造系统的主要关注点。两台机器上的处理时间都是不确定的变量,并且在一些上下边界内。这是由于不确定性是某些制造设置的组成部分,使得无法提前预测加工时间。据作者所知,这是本文第一次讨论这个问题。建立了一种优势关系,并给出了19种结合优势关系的算法。这些算法通过随机生成的数据对不同数量的作业和四种不同的分布(代表对称和非对称分布)进行了广泛的评估。计算实验表明,与随机解相比,所提出的算法性能非常好。其中,19种算法中最好的算法将随机解的误差降低了99.99%,最差的算法(19种算法中)的误差降低了99.96%。通过假设检验验证了结果,并推荐了该算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Minimizing total tardiness in a two-machine flowshop with uncertain and bounded processing times
The two-machine flowshop scheduling problem with the performance measure of total tardiness is addressed. This performance measure is essential since meeting deadlines is a crucial part of scheduling and a major concern for some manufacturing systems. The processing times on both machines are uncertain variables and within some lower and upper bounds. This is due to uncertainty being an integral part of some manufacturing settings, making it impossible to predict processing times in advance. To the best of the author’s knowledge, this problem is addressed for the first time in this paper. A dominance relation is established and nineteen algorithms, which incorporate the established dominance relation, are presented. These algorithms are extensively evaluated through randomly generated data for different numbers of jobs and four different distributions, representing both symmetric and non-symmetric distributions. Computational experiments show that the presented algorithms perform extremely well when compared with a random solution. In particular, the best of the considered 19 algorithms reduces the error of the random solution by 99.99% and the error of the worst algorithm (among the 19 algorithms) by 99.96%. The results are confirmed by a test of hypothesis and this algorithm is recommended.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Erratum to: On interval-valued bilevel optimization problems using upper convexificators On the conformability of regular line graphs A new modified bat algorithm for global optimization A multi-stage stochastic programming approach for an inventory-routing problem considering life cycle On characterizations of solution sets of interval-valued quasiconvex programming problems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1