{"title":"确定项目相互依赖风险的优先级:基于网络的方法","authors":"L. Guan, A. Abbasi, M. Ryan","doi":"10.1109/IEEM50564.2021.9673060","DOIUrl":null,"url":null,"abstract":"Projects are usually exposed to numerous and interdependent risks both internally and externally, making the project risk management process essential to the successful realization of project objectives. Instead of analyzing project risks individually, this paper presents a network-based approach to capturing complex risk interdependencies while prioritizing project risks, which is grounded in the theoretical framework of social network analysis and considers two typical dimensions (i.e., risk occurrence probability, and risk impact) of risk modeling. The concept of the design structure matrix is used to facilitate the establishment of a project risk interdependency network. Five risk indicators (e.g., risk degree centrality, risk betweenness centrality, risk closeness centrality, risk local influence, and risk global influence) are tailored and proposed to prioritize project risks, which can provide project decision makers with a more comprehensive understanding of the project risk profile. Appropriate risk mitigation actions can then be formulated to mainly control critical project risks. An application example is presented to illustrate the utility and validity of the proposed approach.","PeriodicalId":6818,"journal":{"name":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"28 1","pages":"1513-1517"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Prioritizing Project Interdependent Risks: A Network-based Approach\",\"authors\":\"L. Guan, A. Abbasi, M. Ryan\",\"doi\":\"10.1109/IEEM50564.2021.9673060\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Projects are usually exposed to numerous and interdependent risks both internally and externally, making the project risk management process essential to the successful realization of project objectives. Instead of analyzing project risks individually, this paper presents a network-based approach to capturing complex risk interdependencies while prioritizing project risks, which is grounded in the theoretical framework of social network analysis and considers two typical dimensions (i.e., risk occurrence probability, and risk impact) of risk modeling. The concept of the design structure matrix is used to facilitate the establishment of a project risk interdependency network. Five risk indicators (e.g., risk degree centrality, risk betweenness centrality, risk closeness centrality, risk local influence, and risk global influence) are tailored and proposed to prioritize project risks, which can provide project decision makers with a more comprehensive understanding of the project risk profile. Appropriate risk mitigation actions can then be formulated to mainly control critical project risks. An application example is presented to illustrate the utility and validity of the proposed approach.\",\"PeriodicalId\":6818,\"journal\":{\"name\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"28 1\",\"pages\":\"1513-1517\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM50564.2021.9673060\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM50564.2021.9673060","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

项目通常暴露于众多的内部和外部的相互依赖的风险,使得项目风险管理过程对项目目标的成功实现至关重要。本文以社会网络分析的理论框架为基础,考虑了风险建模的两个典型维度(即风险发生概率和风险影响),提出了一种基于网络的方法来捕捉复杂的风险相互依赖关系,同时对项目风险进行优先排序,而不是单独分析项目风险。设计结构矩阵的概念被用来促进项目风险相互依赖网络的建立。提出了风险度中心性、风险中间性中心性、风险接近性中心性、风险局部影响和风险全球影响等5个风险指标,对项目风险进行排序,使项目决策者能够更全面地了解项目风险概况。然后可以制定适当的风险缓解行动,主要控制关键项目风险。最后给出了一个应用实例,说明了该方法的有效性和实用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Prioritizing Project Interdependent Risks: A Network-based Approach
Projects are usually exposed to numerous and interdependent risks both internally and externally, making the project risk management process essential to the successful realization of project objectives. Instead of analyzing project risks individually, this paper presents a network-based approach to capturing complex risk interdependencies while prioritizing project risks, which is grounded in the theoretical framework of social network analysis and considers two typical dimensions (i.e., risk occurrence probability, and risk impact) of risk modeling. The concept of the design structure matrix is used to facilitate the establishment of a project risk interdependency network. Five risk indicators (e.g., risk degree centrality, risk betweenness centrality, risk closeness centrality, risk local influence, and risk global influence) are tailored and proposed to prioritize project risks, which can provide project decision makers with a more comprehensive understanding of the project risk profile. Appropriate risk mitigation actions can then be formulated to mainly control critical project risks. An application example is presented to illustrate the utility and validity of the proposed approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Representing Control Software Functionality as Part of a Modular, Mechatronic Construction Kit Situational Awareness and Flight Approach Phase Event Recognition Based on Psychophysiological Measurements The Robust Optimization Approach for the Community Group Purchase Joint Order Fulfillment and Delivery Problem Application of the Multistage One-shot Decision-making Approach to an IT Project in the Central Bank of Oman A Review on Electric Bus Charging Scheduling from Viewpoints of Vehicle Scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1