{"title":"制定中断风险评估清单,以支持使用风险之家降低风险(案例研究:PT.X的COVID-19大流行)","authors":"A. Sudiarno, Sandra Zakiya","doi":"10.1063/5.0118824","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":62545,"journal":{"name":"电工电能新技术","volume":"3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of a disruption risk assessment checklist to support risk mitigation using the house of risk (Case study: COVID-19 pandemic at PT.X)\",\"authors\":\"A. Sudiarno, Sandra Zakiya\",\"doi\":\"10.1063/5.0118824\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":62545,\"journal\":{\"name\":\"电工电能新技术\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"电工电能新技术\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.1063/5.0118824\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"电工电能新技术","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1063/5.0118824","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}