{"title":"提高海上项目经济吸引力的解决方案——巴西石油公司在海底设计方面的经验","authors":"Eduardo Oazen, T. D. F. D. Santos, Gabriel Rodrigues Cabral, Vinicius Garcia Do Prado","doi":"10.4043/29339-MS","DOIUrl":null,"url":null,"abstract":"\n Offshore oil development projects are complex and require high capital investment. The application of methodologies that seek optimization of economic parameters of projects became particularly important since 2014, when oil barrel prices plummeted. At that moment, some projects required modifications to regain economical attractivity. The recovery of project profitability depended on the break-even oil price criterion fulfillment (typically USD 40-45) among other requirements.\n This paper presents a methodology developed by Petrobras to increase the profitability of offshore projects in conceptual design phase while meeting the technical and safety minimum requirements. Successful solutions provided by the Petrobras team, enabled through this methodology, to make more than 15 projects economically viable are presented. The solutions include phased development, reuse of flexible lines from declining production wells, application of new technologies (including boosting and processing), use of innovative subsea architectures, procedures to increase ramp-up speed, long tie-backs, etc. This article is focused on subsea engineering solutions.","PeriodicalId":10948,"journal":{"name":"Day 2 Tue, May 07, 2019","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Solutions to Increase the Economic Attractiveness of Offshore Projects - Petrobras Experience in Subsea Design\",\"authors\":\"Eduardo Oazen, T. D. F. D. Santos, Gabriel Rodrigues Cabral, Vinicius Garcia Do Prado\",\"doi\":\"10.4043/29339-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Offshore oil development projects are complex and require high capital investment. The application of methodologies that seek optimization of economic parameters of projects became particularly important since 2014, when oil barrel prices plummeted. At that moment, some projects required modifications to regain economical attractivity. The recovery of project profitability depended on the break-even oil price criterion fulfillment (typically USD 40-45) among other requirements.\\n This paper presents a methodology developed by Petrobras to increase the profitability of offshore projects in conceptual design phase while meeting the technical and safety minimum requirements. Successful solutions provided by the Petrobras team, enabled through this methodology, to make more than 15 projects economically viable are presented. The solutions include phased development, reuse of flexible lines from declining production wells, application of new technologies (including boosting and processing), use of innovative subsea architectures, procedures to increase ramp-up speed, long tie-backs, etc. This article is focused on subsea engineering solutions.\",\"PeriodicalId\":10948,\"journal\":{\"name\":\"Day 2 Tue, May 07, 2019\",\"volume\":\"36 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, May 07, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29339-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, May 07, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29339-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

海上石油开发项目复杂,需要高资本投资。自2014年油价暴跌以来,寻求项目经济参数优化的方法的应用变得尤为重要。当时,一些项目需要修改以重新获得经济吸引力。项目盈利能力的恢复取决于盈亏平衡油价标准的实现(通常为40-45美元)和其他要求。本文介绍了巴西石油公司开发的一种方法,该方法可以在满足技术和安全最低要求的同时,提高海上项目在概念设计阶段的盈利能力。Petrobras团队通过这种方法提供了成功的解决方案,使超过15个项目具有经济可行性。这些解决方案包括分阶段开发、重新利用产量下降井的柔性管线、应用新技术(包括增压和处理)、使用创新的海底架构、提高提速的程序、长回接等。本文主要关注海底工程解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Solutions to Increase the Economic Attractiveness of Offshore Projects - Petrobras Experience in Subsea Design
Offshore oil development projects are complex and require high capital investment. The application of methodologies that seek optimization of economic parameters of projects became particularly important since 2014, when oil barrel prices plummeted. At that moment, some projects required modifications to regain economical attractivity. The recovery of project profitability depended on the break-even oil price criterion fulfillment (typically USD 40-45) among other requirements. This paper presents a methodology developed by Petrobras to increase the profitability of offshore projects in conceptual design phase while meeting the technical and safety minimum requirements. Successful solutions provided by the Petrobras team, enabled through this methodology, to make more than 15 projects economically viable are presented. The solutions include phased development, reuse of flexible lines from declining production wells, application of new technologies (including boosting and processing), use of innovative subsea architectures, procedures to increase ramp-up speed, long tie-backs, etc. This article is focused on subsea engineering solutions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Implementing the New INCOSE Systems Engineering Competency Framework Using an Evidence Based Approach for Oil and Gas Companies A Machine Learning Application for Field Planning Optimization of Well Start-Up Using Integrated Well and Electrical Submersible Pump Modeling The Subsea Sand Management Challenge – What to Do with the Sand? Systems Engineering Principles to Enable Supplier-Led Solutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1