{"title":"结合多种测量方法确定建筑结构角部位置的精度评估","authors":"Robert Krzyżek, Anna Przewięźlikowska","doi":"10.1515/rgg-2017-0014","DOIUrl":null,"url":null,"abstract":"Abstract When surveys of corners of building structures are carried out, surveyors frequently use a compilation of two surveying methods. The first one involves the determination of several corners with reference to a geodetic control using classical methods of surveying field details. The second method relates to the remaining corner points of a structure, which are determined in sequence from distance-distance intersection, using control linear values of the wall faces of the building, the so-called tie distances. This paper assesses the accuracy of coordinates of corner points of a building structure, determined using the method of distance-distance intersection, based on the corners which had previously been determined by the conducted surveys tied to a geodetic control. It should be noted, however, that such a method of surveying the corners of building structures from linear measures is based on the details of the first-order accuracy, while the regulations explicitly allow such measurement only for the details of the second- and third-order accuracy. Therefore, a question arises whether this legal provision is unfounded, or whether surveyors are acting not only against the applicable standards but also without due diligence while performing surveys? This study provides answers to the formulated problem. The main purpose of the study was to verify whether the actual method which is used in practice for surveying building structures allows to obtain the required accuracy of coordinates of the points being determined, or whether it should be strictly forbidden. The results of the conducted studies clearly demonstrate that the problem is definitely more complex. Eventually, however, it might be assumed that assessment of the accuracy in determining a location of corners of a building using a combination of two different surveying methods will meet the requirements of the regulation [MIA, 2011), subject to compliance with relevant baseline criteria, which have been presented in this study. Observance of the proposed boundary conditions would allow for frequent performance of surveys of building structures by surveyors (from tie distances), while maintaining the applicable accuracy criteria. This would allow for the inclusion of surveying documentation into the national geodetic and cartographic documentation center database pursuant to the legal bases.","PeriodicalId":42010,"journal":{"name":"Reports on Geodesy and Geoinformatics","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2017-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Accuracy Assessment in Determining the Location of Corners of Building Structures Using a Combination of Various Measurement Methods\",\"authors\":\"Robert Krzyżek, Anna Przewięźlikowska\",\"doi\":\"10.1515/rgg-2017-0014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract When surveys of corners of building structures are carried out, surveyors frequently use a compilation of two surveying methods. The first one involves the determination of several corners with reference to a geodetic control using classical methods of surveying field details. The second method relates to the remaining corner points of a structure, which are determined in sequence from distance-distance intersection, using control linear values of the wall faces of the building, the so-called tie distances. This paper assesses the accuracy of coordinates of corner points of a building structure, determined using the method of distance-distance intersection, based on the corners which had previously been determined by the conducted surveys tied to a geodetic control. It should be noted, however, that such a method of surveying the corners of building structures from linear measures is based on the details of the first-order accuracy, while the regulations explicitly allow such measurement only for the details of the second- and third-order accuracy. Therefore, a question arises whether this legal provision is unfounded, or whether surveyors are acting not only against the applicable standards but also without due diligence while performing surveys? This study provides answers to the formulated problem. The main purpose of the study was to verify whether the actual method which is used in practice for surveying building structures allows to obtain the required accuracy of coordinates of the points being determined, or whether it should be strictly forbidden. The results of the conducted studies clearly demonstrate that the problem is definitely more complex. Eventually, however, it might be assumed that assessment of the accuracy in determining a location of corners of a building using a combination of two different surveying methods will meet the requirements of the regulation [MIA, 2011), subject to compliance with relevant baseline criteria, which have been presented in this study. Observance of the proposed boundary conditions would allow for frequent performance of surveys of building structures by surveyors (from tie distances), while maintaining the applicable accuracy criteria. This would allow for the inclusion of surveying documentation into the national geodetic and cartographic documentation center database pursuant to the legal bases.\",\"PeriodicalId\":42010,\"journal\":{\"name\":\"Reports on Geodesy and Geoinformatics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2017-12-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Reports on Geodesy and Geoinformatics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/rgg-2017-0014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"REMOTE SENSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Reports on Geodesy and Geoinformatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/rgg-2017-0014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"REMOTE SENSING","Score":null,"Total":0}
引用次数: 4

摘要

摘要在进行建筑结构角测量时,测量员经常采用两种测量方法的组合。第一种方法是使用测量野外细节的经典方法,参照大地测量控制来确定几个角。第二种方法涉及到结构的剩余角点,这些角点是根据距离与距离的相交顺序确定的,使用建筑物墙壁表面的控制线性值,即所谓的联系距离。本文评估了建筑结构角点坐标的精度,使用距离-距离相交的方法确定,基于先前通过与大地测量控制相关联的调查确定的角。然而,应该指出的是,这种从线性测量中测量建筑结构角的方法是基于一阶精度的细节,而法规明确允许这种测量仅用于二阶和三阶精度的细节。因此,问题是这一法律规定是否毫无根据,还是验船师在进行验船时不仅违反了适用的标准,而且没有尽职?这项研究为公式化问题提供了答案。这项研究的主要目的是验证实际用于测量建筑结构的方法是否允许获得所确定的点的坐标所需的精度,或者是否应该严格禁止。所进行的研究结果清楚地表明,问题肯定要复杂得多。然而,最终可以假设,在符合本研究中提出的相关基线标准的前提下,使用两种不同测量方法组合确定建筑物角落位置的准确性评估将满足法规的要求[MIA, 2011]。若遵守建议的边界条件,测量员便可经常(从近距离)测量建筑物结构,同时保持适用的精度标准。这样就可以根据法律基础将测量文件列入国家大地测量和制图文件中心数据库。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Accuracy Assessment in Determining the Location of Corners of Building Structures Using a Combination of Various Measurement Methods
Abstract When surveys of corners of building structures are carried out, surveyors frequently use a compilation of two surveying methods. The first one involves the determination of several corners with reference to a geodetic control using classical methods of surveying field details. The second method relates to the remaining corner points of a structure, which are determined in sequence from distance-distance intersection, using control linear values of the wall faces of the building, the so-called tie distances. This paper assesses the accuracy of coordinates of corner points of a building structure, determined using the method of distance-distance intersection, based on the corners which had previously been determined by the conducted surveys tied to a geodetic control. It should be noted, however, that such a method of surveying the corners of building structures from linear measures is based on the details of the first-order accuracy, while the regulations explicitly allow such measurement only for the details of the second- and third-order accuracy. Therefore, a question arises whether this legal provision is unfounded, or whether surveyors are acting not only against the applicable standards but also without due diligence while performing surveys? This study provides answers to the formulated problem. The main purpose of the study was to verify whether the actual method which is used in practice for surveying building structures allows to obtain the required accuracy of coordinates of the points being determined, or whether it should be strictly forbidden. The results of the conducted studies clearly demonstrate that the problem is definitely more complex. Eventually, however, it might be assumed that assessment of the accuracy in determining a location of corners of a building using a combination of two different surveying methods will meet the requirements of the regulation [MIA, 2011), subject to compliance with relevant baseline criteria, which have been presented in this study. Observance of the proposed boundary conditions would allow for frequent performance of surveys of building structures by surveyors (from tie distances), while maintaining the applicable accuracy criteria. This would allow for the inclusion of surveying documentation into the national geodetic and cartographic documentation center database pursuant to the legal bases.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
28.60%
发文量
5
审稿时长
12 weeks
期刊最新文献
Geoprocessing of archival aerial photos and their scientific applications: A review Investigation of the accuracy of BeiDou, QZSS and QZSS/BeiDou satellites configuration for short, medium and long baselines in the Asia-Pacific regions Site-specific efficient management of soil resources using GIS and BIM technologies Accuracy of the application of mobile technologies for measurements made in headings of the Kłodawa Salt Mine Accuracy assessment of high and ultra high-resolution combined GGMs, and recent satellite-only GGMs – Case studies of Poland and Ethiopia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1