Y. Eglit, C. Eglite, E. Yurchenko, V. Dudin, D. Yavorskaya
{"title":"港口建设投资“软”过程的动态模型基于计算机技术的优化程序","authors":"Y. Eglit, C. Eglite, E. Yurchenko, V. Dudin, D. Yavorskaya","doi":"10.34046/aumsuomt105/12","DOIUrl":null,"url":null,"abstract":"This work is a rationale for the use and effectiveness of the dynamic model of the soft investment process of \nport construction. For this purpose, this work presents the necessary statistical data and mathematical calculations, \nwhich include the use of various methods for analyzing the investment plan, as well as a number of \nmethods for calculating the cost of investment payments, including the use of the matLAB digital mathematical \nenvironment to simplify the process of calculating.","PeriodicalId":19521,"journal":{"name":"Operation of Maritime Transport","volume":"28 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DYNAMIC MODEL OF “SOFT” PROCESS OF INVESTING IN PORT CONSTRUCTION. OPTIMIZATION PROCEDURES BASED ON COMPUTER TECHNOLOGY\",\"authors\":\"Y. Eglit, C. Eglite, E. Yurchenko, V. Dudin, D. Yavorskaya\",\"doi\":\"10.34046/aumsuomt105/12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work is a rationale for the use and effectiveness of the dynamic model of the soft investment process of \\nport construction. For this purpose, this work presents the necessary statistical data and mathematical calculations, \\nwhich include the use of various methods for analyzing the investment plan, as well as a number of \\nmethods for calculating the cost of investment payments, including the use of the matLAB digital mathematical \\nenvironment to simplify the process of calculating.\",\"PeriodicalId\":19521,\"journal\":{\"name\":\"Operation of Maritime Transport\",\"volume\":\"28 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operation of Maritime Transport\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34046/aumsuomt105/12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operation of Maritime Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34046/aumsuomt105/12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
DYNAMIC MODEL OF “SOFT” PROCESS OF INVESTING IN PORT CONSTRUCTION. OPTIMIZATION PROCEDURES BASED ON COMPUTER TECHNOLOGY
This work is a rationale for the use and effectiveness of the dynamic model of the soft investment process of
port construction. For this purpose, this work presents the necessary statistical data and mathematical calculations,
which include the use of various methods for analyzing the investment plan, as well as a number of
methods for calculating the cost of investment payments, including the use of the matLAB digital mathematical
environment to simplify the process of calculating.